Flexible Job Shop Scheduling Multi-objective Optimization Based on Improved Strength Pareto Evolutionary Algorithm

被引:3
|
作者
Wei, Wei [2 ]
Feng, Yixiong [1 ]
Tan, Jianrong [1 ]
Hagiwara, Ichiro [3 ]
机构
[1] Zhejiang Univ, State Key Lab Fluid Power Transmiss & Control, Hangzhou 310003, Zhejiang, Peoples R China
[2] Beihang Univ, Sch Mfg Engn & Automat, Adv Mfg Technol & Syst Res Ctr, Beijing 100191, Peoples R China
[3] Tokyo Inst Technol, Dept Mech Sci & Engn, Tokyo 1528550, Japan
基金
中国国家自然科学基金;
关键词
Flexible job shop scheduling; Multi-objective optimization; SPEA2+; Genetic algorithm;
D O I
10.4028/www.scientific.net/AMR.186.546
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Scheduling for the flexible job shop is very important in fields of production management. To solve the multi objective optimization in flexible job shop scheduling problem (FJSP), the FJSP multi-objective optimization model is constructed. The cost, quality and time are taken as the optimization objectives. An improved strength Pareto evolutionary algorithm (SPEA2+) is put forward to optimize the multi-objective optimization model parallelly. The algorithm uses a new model of a Multi-objective genetic algorithm that includes more effective crossover and could obtain diverse solutions in the objective and variable spaces to archive the Pareto optimal sets for FJSP multi-objective optimization. Then an approach based on fuzzy set theory was developed to extract one of the Pareto-optimal solutions as the best compromise one. The optimization results were compared with those obtained by NSGA-II and POS. At last, an instance of flexible job shop scheduling problem in automotive industry is given to illustrate that the proposed method can solve the multi-objective FJSP effectively.
引用
收藏
页码:546 / +
页数:2
相关论文
共 50 条
  • [41] Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem
    Rahmati, Seyed Habib A.
    Zandieh, M.
    Yazdani, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (5-8): : 915 - 932
  • [42] Improved Heuristic Kalman Algorithm for Solving Multi-Objective Flexible Job Shop Scheduling Problem
    Robert, Ojstersek
    Zhang Hankun
    Liu Shifeng
    Borut, Buchmeister
    28TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2018): GLOBAL INTEGRATION OF INTELLIGENT MANUFACTURING AND SMART INDUSTRY FOR GOOD OF HUMANITY, 2018, 17 : 895 - 902
  • [43] An improved multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Li, Wenfeng
    Zhang, Ying
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2013, 47 (2-3) : 280 - 288
  • [44] Genetic algorithm in flexible work shop scheduling based on multi-objective optimization
    Wang, Yahui
    Fu, Liuqiang
    Su, Yongqiang
    Yang, Qian
    Wu, Linfeng
    JOURNAL OF INTERDISCIPLINARY MATHEMATICS, 2018, 21 (05) : 1249 - 1254
  • [45] An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem
    Jia, Zhaohong
    Chen, Huaping
    Tang, Jun
    PROCEEDINGS OF 2007 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES, VOLS 1 AND 2, 2007, : 1584 - 1589
  • [46] A PARTICLE SWARM OPTIMIZATION ALGORITHM FOR THE MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM
    Sun, Ying
    He, Jingbo
    JOURNAL OF NONLINEAR AND CONVEX ANALYSIS, 2024, 25 (03) : 579 - 590
  • [47] A hybrid Pareto-based local search for multi-objective flexible job shop scheduling problem
    Li, Junqing
    Pan, Quanke
    2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2010,
  • [48] Two-stage hybrid pareto ant colony algorithm for multi-objective flexible job shop scheduling
    Zhao B.
    Gao J.
    Chen K.
    Gao, Jianmin, 1600, Xi'an Jiaotong University (50): : 145 - 151
  • [49] Approach for Multi-objective Flexible Job shop scheduling
    Hui, Hongjie
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 407 - 410
  • [50] Dynamic scheduling on multi-objective flexible Job Shop
    Liu, Ai-Jun
    Yang, Yu
    Xing, Qing-Song
    Lu, Hui
    Zhang, Yu-Dong
    Zhou, Zhen-Yu
    Wu, Guang-Hui
    Zhao, Xiao-Hua
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2629 - 2637