共 50 条
- [41] Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (5-8): : 915 - 932
- [42] Improved Heuristic Kalman Algorithm for Solving Multi-Objective Flexible Job Shop Scheduling Problem 28TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2018): GLOBAL INTEGRATION OF INTELLIGENT MANUFACTURING AND SMART INDUSTRY FOR GOOD OF HUMANITY, 2018, 17 : 895 - 902
- [45] An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem PROCEEDINGS OF 2007 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES, VOLS 1 AND 2, 2007, : 1584 - 1589
- [47] A hybrid Pareto-based local search for multi-objective flexible job shop scheduling problem 2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2010,
- [48] Two-stage hybrid pareto ant colony algorithm for multi-objective flexible job shop scheduling Gao, Jianmin, 1600, Xi'an Jiaotong University (50): : 145 - 151
- [49] Approach for Multi-objective Flexible Job shop scheduling AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 407 - 410
- [50] Dynamic scheduling on multi-objective flexible Job Shop Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2629 - 2637