Saudi Arabian aviation construction projects: Identification of risks and their consequences

被引:20
作者
Baghdadi, Ahmad [1 ]
Kishk, Mohammed
机构
[1] Robert Gordon Univ, Scott Sutherland Sch Architecture & Built Environ, Aberdeen AB10 7QB, Scotland
来源
CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS | 2015年 / 123卷
关键词
aviation construction projects; GACA; risks; risk management; Saudi Arabia;
D O I
10.1016/j.proeng.2015.10.054
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Airport projects are considered to be very complex, as they face a number of challenges which inevitably expose them to risks. In Saudi Arabia, the aviation sector is considered an important sector due to the fact that Saudi Arabia is the first destination for Muslims on an annual basis. As a result, the Saudi government has allocated a significant amount of its general budget to this sector through the General Authority of Civil Aviation (GACA). However, it has been found that these projects are still delivered with a significant number of time and cost overruns. These consequences are typically generated from the risks involved in the projects. Thus, the aim of this paper was twofold: first, to identify risks associated with aviation construction projects in Saudi Arabia and, second, to evaluate the consequences of these risks on a number of GACA projects. Critical literature reviews of common risks associated with aviation projects have been carried out. These were followed by 13 semi-structured interviews with expert project managers, including clients, contractors and consultants who have been involved in GACA projects. As a result, 54 new risks have been identified and classified into three levels: internal, external and force majeure. Results have confirmed the existence of time and cost overruns for GACA projects. The significance of the identified risks is currently being assessed and will be reported in a further paper. (C) 2015 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:32 / 40
页数:9
相关论文
共 25 条
  • [1] Adrem A., 2006, Managing airports construction projects
  • [2] CONSTRUCTION-INDUSTRY IN SAUDI-ARABIA
    ALJARALLAH, MI
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1983, 109 (04): : 355 - 368
  • [3] Alnuaimi A.S., 2013, INT C INNOVATIONS EN, P267
  • [4] [Anonymous], INT J PROJ MANAG
  • [5] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    [J]. Int. J. Proj. Manage., 2006, 4 (349-357): : 349 - 357
  • [6] CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS
    ASSAF, SA
    ALKHALIL, M
    ALHAZMI, M
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 45 - 50
  • [7] Flouris T., 2009, MANAGING AVIATION PR
  • [8] Kapur Anil., 1995, Airport Infrastructure: The Emerging Role of the Private Structure
  • [9] Causes and effects of delays in Malaysian construction industry
    Sambasivan, Murali
    Soon, Yau Wen
    [J]. International Journal of Project Management, 2007, 25 (05) : 517 - 526
  • [10] ZOU PXW, 2007, INT J PROJECT MANAGE