LABOR PRODUCTIVITY IMPROVEMENT IN A CONSTRUCTION PROJECT: PROBLEM BASED APPROACH

被引:0
|
作者
Porntepkasemsant, Patraporn [1 ]
Charoenpornpattana, Santi [1 ]
机构
[1] King Mongkuts Univ Technol Thonburi, Dept Civil Engn, Construct Engn & Management Program, Bangkok, Thailand
来源
IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT | 2015年
关键词
Productivity; Construction; Improvement; Thailand;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction labor productivity is an important aspect of a construction project. However, low productivity problems have had a significant impact on construction project timeframes resulting in over budget expenditure. The objective of this study was to determine the factors affecting labor productivity in Thai construction projects. A structured questionnaire survey was employed, completed by 54 executive managers from leading companies in Thailand The five highest importance ranking factors affecting labor productivity were found to be: lack of workers, financial shortages, incomplete drawings, labor skill and experience, and incompetent construction management team. It is hoped that the results of this research will lead to improved productivity and effectively in project work. The study is an initial investigation about labor productivity and examines the improvements necessary to make the Thai construction industry more competitive and profitable.
引用
收藏
页码:1071 / 1076
页数:6
相关论文
共 50 条
  • [21] Determination of construction process duration based on labor productivity estimation: A case study
    Kubeckova, Darja
    Smugala, Stanislav
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2021, 13 (02): : 2521 - 2538
  • [22] Estimating Construction Labor Productivity Frontier: Pilot Study
    Mani, Nirajan
    Kisi, Krishna P.
    Rojas, Eddy M.
    Foster, E. Terence
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (10)
  • [23] Towards improving construction labor productivity and projects' performance
    Shehata, Mostafa E.
    El-Gohary, Khaled M.
    ALEXANDRIA ENGINEERING JOURNAL, 2011, 50 (04) : 321 - 330
  • [24] Comparative Study of Activity-Based Construction Labor Productivity in the United States and China
    Shen, Zhigang
    Jensen, Wayne
    Berryman, Charles
    Zhu, Yimin
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2011, 27 (02) : 116 - 124
  • [25] A simulation-based framework for concurrent safety and productivity improvement in construction projects
    Baniassadi, Farshid
    Alvanchi, Amin
    Mostafavi, Ali
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (11) : 1501 - 1515
  • [26] Planning-Based Approach for Fusing Data from Multiple Sources for Construction Productivity Monitoring
    Pradhan, Anu
    Akinci, Burcu
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2012, 26 (04) : 530 - 540
  • [27] Knowledge Sharing and Productivity Improvement: An Agent-Based Modeling Approach
    Kiomjian, Daoud
    Srour, Issam
    Srour, F. Jordan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (07)
  • [28] Project-specific constraints influencing productivity of tradespeople in the Nigerian construction industry
    Ugulu, Rex Asibuodu
    Arewa, Andrew
    Allen, Stephen
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2020, 10 (01) : 94 - 109
  • [29] A DST-based approach for construction project risk analysis
    Taroun, A.
    Yang, J-B
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (08) : 1221 - 1230
  • [30] AN AGENT-BASED APPROACH FOR MODELING THE EFFECT OF LEARNING CURVE ON LABOR PRODUCTIVITY
    Shehwaro, H.
    Zankoul, E.
    Khoury, H.
    PROCEEDINGS OF INTERNATIONAL STRUCTURAL ENGINEERING AND CONSTRUCTION: INTERACTION BETWEEN THEORY AND PRACTICE IN CIVIL ENGINEERING AND CONSTRUCTION, 2016, : 673 - 678