Particle swarm optimization based-algorithms to solve the two-machine cross-docking flow shop problem: just in time scheduling

被引:2
作者
Hamdi, Imen [1 ,2 ]
Boujneh, Imen [1 ]
机构
[1] Univ Sousse, High Inst Transport & Logist, Sousse, Tunisia
[2] Univ Sfax, Fac Econ & Management, MODILS Lab, Sfax, Tunisia
基金
英国科研创新办公室;
关键词
Cross-docking; Scheduling; PSO based-algorithms; Just in time; Lower Bound; SINGLE-MACHINE; GENETIC ALGORITHM; MAXIMUM EARLINESS; TARDINESS; MAKESPAN; MINIMIZE; SUM;
D O I
10.1007/s10878-022-00871-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Cross-docking is an innovative logistical strategy which provides less inventory holding costs, less transportation costs and fast customer deliveries without storage in between or less than 24 hours. In this paper, we address the two-machine cross-docking scheduling problem within a Just-In-Time (JIT) context. This latter requires the punctuality and exactness of product deliveries. To satisfy this target, we aim to minimize the total earliness and tardiness, then early or tardy deliveries are discouraged. This study presents a great contribution in solving such NP-hard problem while applying different versions of the PSO (Particle Swarm Optimization) algorithm. One of them is hybridized with the Genetic Algorithm (GA). This latter is then shown to be the best one over computational experiments using different sized instances and by determining a percentage deviation from a developed lower bound.
引用
收藏
页码:947 / 969
页数:23
相关论文
共 48 条
[1]  
Agustina D, 2011, IEEE INT C IND ENG E
[2]   Crossdocking-Just in Time scheduling: an alternative solution approach [J].
Alvarez-Perez, G. A. ;
Gonzalez-Velarde, J. L. ;
Fowler, J. W. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (04) :554-564
[3]  
Amin-nayeri MR., 2000, J ESTEGHLAL ISFAHAN, V19, P35
[4]   A multi-criteria cross-docking scheduling with just-in-time approach [J].
Arabani, A. R. Boloori ;
Ghomi, S. M. T. Fatemi ;
Zandieh, M. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8) :741-756
[5]   Minimizing the makespan in a two-machine cross-docking flow shop problem [J].
Chen, Feng ;
Lee, Chung-Yee .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 193 (01) :59-72
[6]   A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem [J].
Chen, Jen-Shiang ;
Pan, Jason Chao-Hsien ;
Lin, Chien-Min .
EXPERT SYSTEMS WITH APPLICATIONS, 2008, 34 (01) :570-577
[7]   A study on flowshop scheduling problem combining Taguchi experimental design and genetic algorithm [J].
Cheng, Bor-Wen ;
Chang, Chun-Lang .
EXPERT SYSTEMS WITH APPLICATIONS, 2007, 32 (02) :415-421
[8]  
Cook R.L., 2005, Supply Chain Management Review, V9, P54
[9]   A Delayed Start Parallel Evolutionary Algorithm for just-in-time truck scheduling at a cross-docking facility [J].
Dulebenets, Maxim A. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 212 :236-258
[10]  
Eberhart RC, 2001, IEEE C EVOL COMPUTAT, P81, DOI 10.1109/CEC.2001.934374