共 50 条
- [22] A note on the two-stage hybrid flow shop problem with dedicated machines Optimization Letters, 2012, 6 : 1731 - 1736
- [25] Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint The International Journal of Advanced Manufacturing Technology, 2014, 70 : 501 - 514
- [27] Lot streaming hybrid assembly flow shop scheduling on migratory bird algorithm Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2022, 56 (11): : 2135 - 2144
- [28] Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (1-4): : 501 - 514
- [30] Lot streaming Permutation Flow shop with energy awareness INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2021, 12 (01): : 25 - 36