A multi-echelon system's simulation model for repairable and consumable items management

被引:0
作者
Cunha, ME [1 ]
Póvoa, AP [1 ]
Lopes, JA [1 ]
机构
[1] Univ Autonoma Lisboa, Dep Ciencias & Tecnol, P-1169023 Lisbon, Portugal
来源
2nd International Industrial Simulation Conference 2004 | 2004年
关键词
inventory management; reparable items; multi-echelon systems; simulation; logistics; stochastic models; decision aid systems;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Repairable items inventory management is complex and important. On the one hand, complexity is due to a variety of reasons such as system structure, unknown repair times and multi-indenture item configuration. On the other hand, importance is traced since stock determines systems operability. Several multi-echelon inventory models for repairable items have been developed, however even the most recent have restrictions to their successful application. To surpass some of these limitations a simulation model is developed in this work. This not only permits the explicit consideration of hierarchical parts structure but also admits a multi-echelon structure system (three levels). Depending on the failure, reparation can be done at different places and the repair time depends on the components' stock or, if there are none, on the repair time of the missing items. The model establishes a relationship between the system's operability and the stock of the different parts. An (s,Q) or (S-1,S) inventory policy is assumed for consumable or repairable items respectively. The resulting model is quite general where no restrictive assumptions on the cases to model are required.
引用
收藏
页码:353 / 357
页数:5
相关论文
共 5 条
  • [1] DIAZ A, 2003, INT J LOGIST-RES APP, V6, P51
  • [2] Repairable inventory theory: Models and applications
    Guide, VDR
    Srivastava, R
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 102 (01) : 1 - 20
  • [3] *IM THAT INC, 1998, PROGR SIM COMP PESS
  • [4] Spare parts management at complex technology-based organizations: An agenda for research
    Rustenburg, WD
    van Houtum, GJ
    Zijm, WHM
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 71 (1-3) : 177 - 193
  • [5] METRIC - A MULTI-ECHELON TECHNIQUE FOR RECOVERABLE IETM CONTROL
    SHERBROOKE, CC
    [J]. OPERATIONS RESEARCH, 1968, 16 (01) : 122 - +