Stakeholder Views on Financing Carbon Capture and Storage Demonstration Projects in China

被引:15
作者
Reiner, David [1 ]
Liang, Xi [2 ]
机构
[1] Univ Cambridge, Judge Business Sch, Cambridge CB2 1AG, England
[2] Univ Exeter, Dept Geog, Exeter EX4 4SB, Devon, England
关键词
UNCERTAINTY; DEPLOYMENT; PLANTS; READY;
D O I
10.1021/es203037j
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Chinese stakeholders (131) from 68 key institutions in 27 provinces were consulted in spring 2009 in an online survey of their perceptions of the barriers and opportunities in financing large-scale carbon dioxide capture and storage (CCS) demonstration projects in China. The online survey was supplemented by 31 follow-up face-to-face interviews. The National Development and Reform Commission (NDRC) was widely perceived as the most important institution in authorizing the first commercial-scale CCS demonstration project and authorization was viewed as more similar to that for a power project than a chemicals project. There were disagreements, however, on the appropriate size for a demonstration plant, the type of capture, and the type of storage. Most stakeholders believed that the international image of the Chinese Government could benefit from demonstrating commercial CCS and that such a project could also create advantages for Chinese companies investing in CCS technologies. In more detailed interviews with 16 financial officials, we found striking disagreements over the perceived risks of demonstrating CCS. The rate of return seen as appropriate for financing demonstration projects was split between stakeholders from development banks (who supported a rate of 5-8%) and those from commercial banks (12-20%). The divergence on rate alone could result in as much as a 40% difference in the cost of CO2 abatement and 56% higher levelized cost of electricity based on a hypothetical case study of a typical 600-MW new build ultrasupercritical pulverized coal-fired (USCPC) power plant. To finance the extra operational costs, there were sharp divisions over which institution's should bear the brunt of financing although, overall, more than half of the support was expected to come from foreign and Chinese governments.
引用
收藏
页码:643 / 651
页数:9
相关论文
共 21 条
[1]  
[Anonymous], 2007, WORLD EN OUTL 2007 C
[2]  
CEC, 2009, AN FOR NAT EL SUPPL
[3]   Deployment Models for Commercialized Carbon Capture and Storage [J].
Esposito, Richard A. ;
Monroe, Larry S. ;
Friedman, Julio S. .
ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2011, 45 (01) :139-146
[4]  
IEA, TECHN ROADM CARB CAP
[5]   Options for Near-Term Phaseout of CO2 Emissions from Coal Use in the United States [J].
Kharecha, Pushker A. ;
Kutscher, Charles F. ;
Hansen, James E. ;
Mazria, Edward .
ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2010, 44 (11) :4050-4062
[6]   Financing New Power Plants 'CCS Ready' in China - a case study of Shenzhen city [J].
Li, Jia ;
Liang, Xi ;
Reiner, David ;
Gibbins, Jon ;
Lucquiaud, Mathieu ;
Chalmers, Hannah .
10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 :2572-2579
[7]   Barriers and incentives of CCS deployment in China: Results from semi-structured interviews [J].
Liang Dapeng ;
Wu Weiwei .
ENERGY POLICY, 2009, 37 (06) :2421-2432
[8]   Perceptions of opinion leaders towards CCS demonstration projects in China [J].
Liang, Xi ;
Reiner, David ;
Li, Jia .
APPLIED ENERGY, 2011, 88 (05) :1873-1885
[9]   Getting ready for carbon capture and storage by issuing capture options [J].
Liang, Xi ;
Reiner, David ;
Gibbins, Jon ;
Li, Jia .
ENVIRONMENT AND PLANNING A-ECONOMY AND SPACE, 2010, 42 (06) :1286-1307
[10]   Behavioral Issues in Financing Low Carbon Power Plants [J].
Liang, Xi ;
Reiner, David .
GREENHOUSE GAS CONTROL TECHNOLOGIES 9, 2009, 1 (01) :4495-4502