Estimating the economic cost of setting up a nuclear power plant at Rooppur in Bangladesh

被引:6
作者
Goswami, Gour Gobinda [1 ]
Rahman, Umama [2 ]
Chowdhury, Mehdi [3 ]
机构
[1] North South Univ, Dept Econ, Plot 15,Block B, Dhaka 1229, Bangladesh
[2] North South Univ, Dept Management, Plot 15,Block B, Dhaka 1229, Bangladesh
[3] Bournemouth Univ, Dept Accounting Finance & Econ, Business Sch, Dorset House Talbot Campus, Poole BH12 5BB, Dorset, England
关键词
Nuclear power plant; Rooppur; Nuclear power; Nuclear energy; Atomic energy; Levelized cost of electricity (LCOE); Cost-benefit analysis; Discounted present value method; Bangladesh; India; ENERGY; RISKS;
D O I
10.1007/s11356-021-18129-3
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Bangladesh government is in the final stage of setting up one nuclear power plant with two units at Rooppur, Ishwardi, each having 1200 MW capacity, to be launched in 2023 to meet the energy shortage urgently. The financial cost of the project is the US $12.65 billion. The primary purpose of this paper is to calculate the economic cost of setting up this plant by using the estimation method developed by Du and Parsons (2009), MIT (2003; 2009; 2018), and Singh et al. (2018). It has been found that the economic cost is amounted to 9.36 cents/kWh for the capacity of 2400 MW. In contrast, for a similar plant in Kudankulam, Tamil Nadu, India, the corresponding cost figure is 5.36 cents/kWh for 2000 MW. Even though it seems costlier than India, the study suggests that policymakers should prefer nuclear power, as it is cost-competitive, considering the production cost of other electricity facilities. The main advantage of nuclear power is cost-competitive baseload power generation with zero carbon emission. This nuclear power plant (NPP) project is expected to boost the energy sector of Bangladesh by transforming the country from an energy deficit country into an energy surplus country.
引用
收藏
页码:35073 / 35095
页数:23
相关论文
共 46 条
  • [21] Korkmaz Y., 2016, J. Soc. Admin. Sci., V3, P141, DOI [10.1453/jsas.v3i2.812, DOI 10.1453/JSAS.V3I2.812]
  • [22] The roles of the state and social licence to operate? Lessons from nuclear waste management in Finland, France, and Sweden
    Lehtonen, Markku
    Kojo, Matti
    Jartti, Tuija
    Litmanen, Tapio
    Kari, Mika
    [J]. ENERGY RESEARCH & SOCIAL SCIENCE, 2020, 61
  • [23] The role of nuclear energy in the correction of environmental pollution: Evidence from Pakistan
    Mahmood, Nasir
    Danish
    Wang, Zhaohua
    Zhang, Bin
    [J]. NUCLEAR ENGINEERING AND TECHNOLOGY, 2020, 52 (06) : 1327 - 1333
  • [24] Ministry of Power, 2019, EN SCEN BANGL 2017 1
  • [25] Ministry of Power, 2016, POW SYST MAST PLAN 2
  • [26] MIT, 2018, FUTURE NUCL ENERGY C, DOI DOI 10.1007/978-1-4615-1323-0_17
  • [27] MIT (Massachusetts Institute of Technology), 2003, FUT NUCL POW WORLDW, V2, P4, DOI [10.1504/AFP.2009.027869, DOI 10.1504/AFP.2009.027869]
  • [28] MIT (Massachusetts Institute of Technology), 2009, FUT NUCL POW, DOI [10.1016/B978-0-08-044489-5.X5000-1, DOI 10.1016/B978-0-08-044489-5.X5000-1]
  • [29] Moazzem K. G., 2021, 138 CPD
  • [30] Mostafa SMG, 2017, INT C INN SCI ENG TE, DOI [10.1109/ICISET.2016.7856518, DOI 10.1109/ICISET.2016.7856518]