Estimating the economic cost of setting up a nuclear power plant at Rooppur in Bangladesh

被引:6
作者
Goswami, Gour Gobinda [1 ]
Rahman, Umama [2 ]
Chowdhury, Mehdi [3 ]
机构
[1] North South Univ, Dept Econ, Plot 15,Block B, Dhaka 1229, Bangladesh
[2] North South Univ, Dept Management, Plot 15,Block B, Dhaka 1229, Bangladesh
[3] Bournemouth Univ, Dept Accounting Finance & Econ, Business Sch, Dorset House Talbot Campus, Poole BH12 5BB, Dorset, England
关键词
Nuclear power plant; Rooppur; Nuclear power; Nuclear energy; Atomic energy; Levelized cost of electricity (LCOE); Cost-benefit analysis; Discounted present value method; Bangladesh; India; ENERGY; RISKS;
D O I
10.1007/s11356-021-18129-3
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Bangladesh government is in the final stage of setting up one nuclear power plant with two units at Rooppur, Ishwardi, each having 1200 MW capacity, to be launched in 2023 to meet the energy shortage urgently. The financial cost of the project is the US $12.65 billion. The primary purpose of this paper is to calculate the economic cost of setting up this plant by using the estimation method developed by Du and Parsons (2009), MIT (2003; 2009; 2018), and Singh et al. (2018). It has been found that the economic cost is amounted to 9.36 cents/kWh for the capacity of 2400 MW. In contrast, for a similar plant in Kudankulam, Tamil Nadu, India, the corresponding cost figure is 5.36 cents/kWh for 2000 MW. Even though it seems costlier than India, the study suggests that policymakers should prefer nuclear power, as it is cost-competitive, considering the production cost of other electricity facilities. The main advantage of nuclear power is cost-competitive baseload power generation with zero carbon emission. This nuclear power plant (NPP) project is expected to boost the energy sector of Bangladesh by transforming the country from an energy deficit country into an energy surplus country.
引用
收藏
页码:35073 / 35095
页数:23
相关论文
共 46 条
  • [1] Asian Development Bank, 2020, SECT ASS EN
  • [2] Bangladesh Energy Regulatory Association, 2016, TAR ROOF TOP SOL PV
  • [3] Bangladesh Power Development Board, 2018, ANN REP 2018 2019
  • [4] Bharadwaj A, 2008, NUCL POWER INDIA ROA
  • [5] Bharadwaj Anshu, 2006, ECON POLIT WEEKLY, V41, p1203
  • [6] Market Impacts of a Nuclear Power Plant Closure
    Davis, Lucas
    Hausman, Catherine
    [J]. AMERICAN ECONOMIC JOURNAL-APPLIED ECONOMICS, 2016, 8 (02) : 92 - 122
  • [7] A methodology for calculating the levelized cost of electricity in nuclear power systems with fuel recycling
    De Roo, Guillaume
    Parsons, John E.
    [J]. ENERGY ECONOMICS, 2011, 33 (05) : 826 - 839
  • [8] Du Y, 2009, 09004 CTR EN ENV POL, V2009
  • [9] GED, 2020, Eighth Five-Year Plan: July 2020-June2025
  • [10] Cost overruns and financial risk in the construction of nuclear power reactors: A critical appraisal
    Gilbert, Alexander
    Sovacool, Benjamin K.
    Johnstone, Phil
    Stirling, Andy
    [J]. ENERGY POLICY, 2017, 102 : 644 - 649