A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling

被引:41
作者
Dasovic, Borna [1 ]
Galic, Mario [2 ]
Klansek, Uros [1 ]
机构
[1] Univ Maribor, Fac Civil Engn Transportat Engn & Architecture, Smetanova Ul 17, Maribor 2000, Slovenia
[2] Josip Juraj Strossmayer Univ Osijek, Fac Civil Engn & Architecture Osijek, Ul Vladimira Preloga 3, Osijek 31000, Croatia
关键词
sustainable scheduling; construction execution; optimization; project management tools; software integration; building information modeling; BIM; DECISION-SUPPORT-SYSTEM; GENETIC ALGORITHM; RESOURCE-ALLOCATION; HEURISTIC ALGORITHM; COST; TIME; SIMULATION; CONSTRAINT; MODELS;
D O I
10.3390/su12083405
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Construction scheduling, in practice, commonly relies on the usage of commercial project management tools (PMT) without specific optimization features. To obtain optimal schedules, planners often need to develop separate optimization models with special tools, which, however, demand further processing and editing of optimization results by PMT into forms expected for project management. In this regard, separation of optimization and PMT also requires considerable additional work for complete and harmonized updating of schedules during construction execution. Mentioned drawbacks and lack of available time may take to deficient construction scheduling during the implementation phase resulting in poor or even insufficient realization of project goals. Therefore, this paper presents an achievements survey on the integration of optimization and PMT that allow sustainable construction scheduling, particularly in terms of continuous optimal time and resource allocation throughout the project life cycle. Such work has not yet been comprehensively done up to now and the present contribution intends to fill a literature gap in the aforesaid area. Following a brief introduction, the optimization platform for construction scheduling is given in the article. Focusing on construction scheduling, an in-depth achievements survey on the integration of heuristics methods, mathematical programming and special solving methods with conventional PMT as well as optimization-based building information modeling (BIM) tools is then performed and findings are reported. The paper ends with conclusions and recommendations for further research.
引用
收藏
页数:18
相关论文
共 61 条
[1]   Resource-Constrained Critical Path Scheduling by a GRASP-Based Hyperheuristic [J].
Anagnostopoulos, Konstantinos ;
Koulinas, Georgios .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2012, 26 (02) :204-213
[2]  
Anagnostopoulos KP, 2010, IEEE C EVOL COMPUTAT
[3]   A simulated annealing hyperheuristic for construction resource levelling [J].
Anagnostopoulos, Konstantinos P. ;
Koulinas, Georgios K. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (02) :163-175
[4]  
[Anonymous], 2006, GREEN BUILD
[5]  
AnyLogic, SIM MOD SOFTW TOOLS
[6]   Design Changes in Construction Projects - Causes and Impact on the Cost [J].
Aslam, Mughees ;
Baffoe-Twum, Edmund ;
Saleem, Farhan .
CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (07) :1647-1655
[7]   Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking [J].
Ballesteros-Perez, Pablo ;
Elamrousy, Kamel Mohamed ;
Carmen Gonzalez-Cruz, Ma .
AUTOMATION IN CONSTRUCTION, 2019, 97 :229-240
[8]   Sustainable scheduling analysis [J].
Baruah, Sanjoy ;
Burns, Alan .
27TH IEEE INTERNATIONAL REAL-TIME SYSTEMS SYMPOSIUM, PROCEEDINGS, 2006, :159-+
[9]   Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming [J].
Cajzek, Rok ;
Klansek, Uros .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (10) :2474-2508
[10]  
Crawford J, 2003, 2003 IEEE SYSTEMS & INFORMATION ENGINEERING DESIGN SYMPOSIUM, P95