Reliability Analysis of Phased Mission System Based on Micro-replacment Fault Tree

被引:0
|
作者
Liu, Chenyan [1 ]
Wang, Ruping [1 ]
Wang, Xin [1 ]
Zhou, Yizhou [2 ]
Lu, Wentao [2 ]
机构
[1] China Aero Polytechnol Estab, Design & Anal Dept, Qual Ctr, Beijing, Peoples R China
[2] AQSIQ, Key Lab Qual Infrastruct Efficacy Res, Beijing, Peoples R China
关键词
mission reliability; micro-replacement; fault tree;
D O I
10.1109/PHM-Chongqing.2018.00188
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With the extensive application of phased mission system (PMS), the study of phased mission characteristics becomes more and more necessary and urgent. Considering the multi-mode failure of equipment, this paper proposes a reliability modeling and prediction method based on the micro-replacement fault tree, which is used to solve the reliability analysis problem of phased mission system. We take a typical phased mission system as an example to verify the feasibility of the method. This method provides a simpler and more efficient way to evaluate the reliability of complex systems.
引用
收藏
页码:1061 / 1067
页数:7
相关论文
共 50 条
  • [1] Reliability analysis of phased-mission systems using hierarchical fault tree model
    Gong, Yuhuan
    Wu, Dandan
    Mo, Yuchang
    Journal of Computational Information Systems, 2015, 11 (17): : 6439 - 6450
  • [2] Phased mission modelling using fault tree analysis
    La Band, RA
    Andrews, JD
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2004, 218 (E2) : 83 - 91
  • [3] Variance-based importance analysis measure for mission reliability of phased mission system
    Wu, Xinyang
    Wu, Xiaoyue
    Balakrishnan, Narayanaswamy
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2018, 88 (05) : 841 - 868
  • [4] Phased mission system reliability analysis based on Markov regenerative process
    School of Computer Science and Technology, Harbin Institute of Technology, Harbin 150001, China
    Yuhang Xuebao, 2006, 6 (1335-1340+1364):
  • [5] PRA based reliability analysis of complex space phased-mission system
    Li X.
    Huang H.
    Li F.
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2019, 41 (09): : 2141 - 2147
  • [6] PRA Based Reliability Analysis of Complexly Astronautic Phased-Mission System
    Li, Xiaopeng
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (QR2MSE), VOLS I-IV, 2013, : 326 - 331
  • [7] Reliability analysis of satellite system based on dynamic fault tree
    Zhang, Xiao-Jie
    Zhao, Hai-Tao
    Miao, Qiang
    Zhang, Wei
    Huang, Hong-Zhong
    Yuhang Xuebao/Journal of Astronautics, 2009, 30 (03): : 1249 - 1254
  • [8] Reliability simulation analysis of equipment system based on the fault tree
    Ren, Xin
    Wang, Hui-li
    Ren, Xin
    Zhang, Kai
    Yang, Yi-fang
    Wu, Tie-ying
    2015 3RD INTERNATIONAL SYMPOSIUM ON COMPUTER, COMMUNICATION, CONTROL AND AUTOMATION (3CA 2015), 2015, : 47 - 50
  • [9] Study on Reliability of Sorting System Based on Fault Tree Analysis
    Xu, Y. Z.
    Lv, W.
    Wang, Z. L.
    MANUFACTURING, DESIGN SCIENCE AND INFORMATION ENGINEERING, VOLS I AND II, 2015, : 720 - 726
  • [10] Reliability Analysis of Ventilation System Based on Fuzzy Fault Tree
    Meng, Jun
    ADVANCES IN CHEMICAL, MATERIAL AND METALLURGICAL ENGINEERING, PTS 1-5, 2013, 634-638 : 3670 - 3677