Feedback scheduling for resource-constrained real-time control systems

被引:1
|
作者
Zhou, PF [1 ]
Xie, JY [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Automat, Shanghai 200030, Peoples R China
关键词
D O I
10.1109/CIT.2005.117
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Subject to limited computational resource, feedback scheduling aims to improve, or to optimize, the global control performance of real-time control systems. For the system that consists of simple control tasks, a feedback scheduling scheme is presented to shorten tasks' deadlines online as much as possible, so as to reduce jitter and to improve the performance. For the system that consists of complex control tasks, another feedback scheduling scheme is presented to adjust the reserved processor time for each task dynamically, and thus to optimize the performance, if these tasks can be implemented as anytime algorithm. The general feedback scheduling architecture is introduced The control strategy in both schemes is model predictive control. The designs of feedback controllers are discussed. And the stability conditions are also analyzed.
引用
收藏
页码:800 / 804
页数:5
相关论文
共 50 条
  • [31] Predictive Feedback Scheduling for Resource-Constrained Networks with Flexible Workload
    Li, Zuxin
    Hu, Wenjun
    Wang, Wanliang
    Lei, Bicheng
    2009 INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, VOL III, 2009, : 807 - +
  • [32] Adaptive fuzzy control scheduling of window-constrained real-time systems
    Zhu Xiangbin
    Tu ShiLiang
    ASP-DAC 2005: PROCEEDINGS OF THE ASIA AND SOUTH PACIFIC DESIGN AUTOMATION CONFERENCE, VOLS 1 AND 2, 2005, : 1272 - 1275
  • [33] Scheduling of resource-constrained projects
    Zilinskas, A
    INTERFACES, 2001, 31 (04) : 133 - 135
  • [34] RESOURCE-CONSTRAINED ASSIGNMENT SCHEDULING
    MAZZOLA, JB
    NEEBE, AW
    OPERATIONS RESEARCH, 1986, 34 (04) : 560 - 572
  • [35] HEURISTICS FOR RESOURCE-CONSTRAINED SCHEDULING
    ELSAYED, EA
    NASR, NZ
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (02) : 299 - 310
  • [36] Scheduling of resource-constrained projects
    Wilson, J
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 846 - 846
  • [37] Model predictive control-based feedback scheduling for real-time control systems
    Dept. of Automation, Shanghai Jiaotong Univ., Shanghai 200030, China
    Shanghai Jiaotong Daxue Xuebao, 2006, 5 (838-842+847):
  • [38] An adaptive feedback scheduling algorithm for robot assembly and real-time control systems
    Yuan, Peijiang
    2006 IEEE/RSJ INTERNATIONAL CONFERENCE ON INTELLIGENT ROBOTS AND SYSTEMS, VOLS 1-12, 2006, : 2226 - 2231
  • [39] Thermal-Aware Feedback Control Scheduling for Soft Real-Time Systems
    Yue, Jinming
    Zhang, Tiefei
    Liu, Yannan
    Quan, Baixin
    Chen Tianzhou
    2012 IEEE 14TH INTERNATIONAL CONFERENCE ON HIGH PERFORMANCE COMPUTING AND COMMUNICATIONS & 2012 IEEE 9TH INTERNATIONAL CONFERENCE ON EMBEDDED SOFTWARE AND SYSTEMS (HPCC-ICESS), 2012, : 1479 - 1486
  • [40] Real-time, resource-constrained object classification on a micro-air vehicle
    Buck, Louis
    Ray, Laura
    INTELLIGENT ROBOTS AND COMPUTER VISION XXXI: ALGORITHMS AND TECHNIQUES, 2014, 9025