共 50 条
- [31] Predictive Feedback Scheduling for Resource-Constrained Networks with Flexible Workload 2009 INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, VOL III, 2009, : 807 - +
- [32] Adaptive fuzzy control scheduling of window-constrained real-time systems ASP-DAC 2005: PROCEEDINGS OF THE ASIA AND SOUTH PACIFIC DESIGN AUTOMATION CONFERENCE, VOLS 1 AND 2, 2005, : 1272 - 1275
- [37] Model predictive control-based feedback scheduling for real-time control systems Shanghai Jiaotong Daxue Xuebao, 2006, 5 (838-842+847):
- [38] An adaptive feedback scheduling algorithm for robot assembly and real-time control systems 2006 IEEE/RSJ INTERNATIONAL CONFERENCE ON INTELLIGENT ROBOTS AND SYSTEMS, VOLS 1-12, 2006, : 2226 - 2231
- [39] Thermal-Aware Feedback Control Scheduling for Soft Real-Time Systems 2012 IEEE 14TH INTERNATIONAL CONFERENCE ON HIGH PERFORMANCE COMPUTING AND COMMUNICATIONS & 2012 IEEE 9TH INTERNATIONAL CONFERENCE ON EMBEDDED SOFTWARE AND SYSTEMS (HPCC-ICESS), 2012, : 1479 - 1486
- [40] Real-time, resource-constrained object classification on a micro-air vehicle INTELLIGENT ROBOTS AND COMPUTER VISION XXXI: ALGORITHMS AND TECHNIQUES, 2014, 9025