New Brownian bridge construction in quasi-Monte Carlo methods for computational finance

被引:15
作者
Lin, Junyi [1 ]
Wang, Xiaoqun [1 ]
机构
[1] Tsinghua Univ, Dept Math Sci, Beijing 100084, Peoples R China
基金
中国国家自然科学基金;
关键词
quasi-Monte Carlo methods; Brownian bridge; effective dimension; option pricing;
D O I
10.1016/j.jco.2007.06.001
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Quasi-Monte Carlo (QMC) methods have been playing an important role for high-dimensional problems in Computational finance. Several techniques, such as the Brownian bridge (BB) and the principal component analysis, are Often used in QMC as possible ways to improve the performance of QMC. This paper proposes a new BB construction, which enjoys some interesting properties that appear useful in QMC methods. The basic idea is to choose the new step of a Brownian path in a certain criterion such that it maximizes the variance explained by the new variable while holding all previously chosen steps fixed. It turns out that using this new construction, the first few variables are more "important" (in the sense of explained variance) than those in the ordinary BB construction, while the cost of the generation is still linear in dimension. We present empirical Studies of the proposed algorithm for pricing high-dimensional Asian options and American options, and demonstrate the usefulness of the new BB. (C) 2007 Elsevier Inc. All rights reserved.
引用
收藏
页码:109 / 133
页数:25
相关论文
共 23 条
  • [1] Acworth P.A., 1998, Monte Carlo and Quasi-Monte Carlo Methods 1996, P1
  • [2] Path generation for quasi-Monte Carlo simulation of mortgage-backed securities
    Åkesson, F
    Lehoczky, JP
    [J]. MANAGEMENT SCIENCE, 2000, 46 (09) : 1171 - 1187
  • [3] Monte Carlo methods for security pricing
    Boyle, P
    Broadie, M
    Glasserman, P
    [J]. JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 1997, 21 (8-9) : 1267 - 1321
  • [4] Caflisch R. E., 1997, Journal of Computational Finance, V1, P27
  • [5] Chaudhary SunealK., 2005, J COMPUT FINANC, V8, P101, DOI [10.21314/ jcf.2005.132, DOI 10.21314/JCF.2005.132]
  • [6] Glasserman P., 2004, Monte Carlo Methods in Financial Engineering
  • [7] Imai J, 2004, MONTE CARLO AND QUASI-MONTE CARLO METHODS 2002, P275
  • [8] On the tractability of the Brownian Bridge algorithm
    Larcher, G
    Leobacher, G
    Scheicher, K
    [J]. JOURNAL OF COMPLEXITY, 2003, 19 (04) : 511 - 528
  • [9] Estimating mean dimensionality of analysis of variance decompositions
    Liu, Ruixue
    Owen, Art B.
    [J]. JOURNAL OF THE AMERICAN STATISTICAL ASSOCIATION, 2006, 101 (474) : 712 - 721
  • [10] Valuing American options by simulation: A simple least-squares approach
    Longstaff, FA
    Schwartz, ES
    [J]. REVIEW OF FINANCIAL STUDIES, 2001, 14 (01) : 113 - 147