Effect of economic parameters on power generation expansion planning

被引:24
作者
Sevilgen, SH [1 ]
Erdem, HH [1 ]
Cetin, B [1 ]
Akkaya, AV [1 ]
Dagdas, A [1 ]
机构
[1] Yildiz Tech Univ, Dept Mech Engn, TR-34349 Istanbul, Turkey
关键词
power generation; economic parameters; capacity expansion;
D O I
10.1016/j.enconman.2004.09.006
中图分类号
O414.1 [热力学];
学科分类号
摘要
The increasing consumption of electricity within time forces countries to build additional power plants. Because of technical and economic differences of the additional power plants, economic methodologies are used to determine the best technology for the additional capacity. The annual levelized cost method is used for this purpose, and the technology giving the minimum value for the additional load range is chosen. However, the economic parameters such as interest rate, construction escalation, fuel escalation, maintenance escalation and discount factor can affect the annual levelized. cost considerably and change the economic range of the plants. Determining the values of the economical parameters in the future is very difficult, especially in developing countries. For this reason, the analysis of the changing rates of the mentioned values is of great importance for the planners of the additional capacity. In this study, the changing rates of the economic parameters that influence the annual levelized. cost of the alternative power plant types are discussed. The alternative power plants considered for the electricity generation sector of Turkey and the economic parameters dominating each plant type are determined. It is clearly seen that the annual levelized. cost for additional power plants varies with the economic parameters. The results show that the economic parameters variation has to be taken into consideration in electricity generation planning. (c) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1780 / 1789
页数:10
相关论文
共 12 条
[1]  
ALTINBILEK D, 1998, 1 ENERGY M TURK, V1
[2]  
AYBERS N, 1995, ENERGY COST ISTANBUL, P64
[3]   Economical evaluation of electricity generation considering externalities [J].
El-Kordy, MN ;
Badr, MA ;
Abed, KA ;
Ibrahim, SMA .
RENEWABLE ENERGY, 2002, 25 (02) :317-328
[4]  
ERDEM HH, 2002, INT COMB S 7, P503
[5]   Economical comparison of imported energy sources in terms of long-term-production planning [J].
Güngör, Z ;
Bozkurt, G .
ENERGY, 1999, 24 (01) :31-42
[6]  
Head C., 2000, FINANCING PRIVATE HY
[7]  
MACGREGOR PR, 1993, 37 GE TURB STAT ART, P1
[8]  
SAHIN B, 1994, TURKEY ENERGY C, V4, P95
[9]  
*SPO, 2001, ENERGY RAW MAT REP, P45
[10]  
*SPO, 2001, 8 5 YEAR DEV PLAN, P64