BIM applied in historical building documentation and refurbishing

被引:32
|
作者
Cheng, Hung-Ming [1 ]
Yang, Wun-Bin [1 ]
Yen, Ya-Ning [1 ]
机构
[1] China Univ Technol, 56 Sec 3 ShingLong Rd, Taipei 116, Taiwan
来源
25TH INTERNATIONAL CIPA SYMPOSIUM 2015 | 2015年 / 40-5卷 / W7期
关键词
BIM; architectural tectonics; heritage documentation; 3D laser scanning; time based documentation; heritage refurbishing;
D O I
10.5194/isprsarchives-XL-5-W7-85-2015
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
Historical building conservation raises two important issues which are documentation and refurbishing. For the recording and documentation, we already have developed 3d laser scanner and such photogrammetry technology those represent a freeze object of virtual reality by digital documentation. On the other hand, the refurbished engineering of historic building is a challenge for conservation heritage which are not only reconstructing the damage part but also restoring tangible cultural heritage. 3D digital cultural heritage models has become a topic of great interest in recent years. One reason for this is the more widespread use of laser scanning and photogrammetry for recording cultural heritage sites. These technologies have made it possible to efficiently and accurately record complex structures remotely that would not have been possible with previous survey methods. In addition to these developments, digital information systems are evolving for the presentation, analysis and archival of heritage documentation.
引用
收藏
页码:85 / 90
页数:6
相关论文
共 50 条
  • [31] Investigation of building fire safety measures in building information modelling (BIM) environment
    Besiroglu, Safak
    Serteser, Nuri
    INTERNATIONAL JOURNAL OF ARCHITECTURAL COMPUTING, 2025,
  • [32] Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation
    Zhao, Yu
    Jing, Haotian
    Yu, Miao
    Li, Jiamin
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024,
  • [33] BIM for Sustainable Redevelopment of a Major Office Building in Rome
    Piras, Giuseppe
    Muzi, Francesco
    BUILDINGS, 2025, 15 (05)
  • [34] BIM-Enabled Design Collaboration for Complex Building
    Wang, Jun
    Chong, Heap-Yih
    Shou, Wenchi
    Wang, Xiangyu
    Guo, Jun
    COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING, CDVE 2014, 2014, 8683 : 238 - 244
  • [35] Automation of Building Permission by Integration of BIM and Geospatial Data
    Olsson, Ola
    Axelsson, Josefine
    Hooper, Martin
    Harrie, Lars
    ISPRS INTERNATIONAL JOURNAL OF GEO-INFORMATION, 2018, 7 (08):
  • [36] BIM Management Measure for an Effective Green Building Project
    Maskil-Leitan, Reuven
    Gurevich, Ury
    Reychav, Iris
    BUILDINGS, 2020, 10 (09)
  • [37] POINT CLOUDS FOR USE IN BUILDING INFORMATION MODELS (BIM)
    Klinc, Robert
    Jotanovic, Uros
    Kregar, Klemen
    GEODETSKI VESTNIK, 2021, 65 (04) : 594 - 613
  • [38] Green building design based on BIM and value engineering
    Taibing Wei
    Yuxin Chen
    Journal of Ambient Intelligence and Humanized Computing, 2020, 11 : 3699 - 3706
  • [39] Towards increased BIM usage for existing building interventions
    Barbosa, Margarida Jeronimo
    Pauwels, Pieter
    Ferreira, Victor
    Mateus, Luis
    STRUCTURAL SURVEY, 2016, 34 (02) : 168 - 190
  • [40] BIM and Building Emergency Response Management: Review of Applications
    Seyrfar, Abolfazl
    Osman, Ibrahim
    Ataei, Hossein
    FORENSIC ENGINEERING 2022: ELEVATING FORENSIC ENGINEERING, 2022, : 613 - 619