Adaptive Under-Frequency Load-Shedding Considering Load Dynamics and Post Corrective Actions to Prevent Voltage Instability

被引:14
作者
Horri, Ramin [1 ]
Roudsari, H. Mahdinia [2 ]
机构
[1] Istanbul Tech Univ, Fac Elect & Elect Engn, Dept Elect Engn, Istanbul, Turkey
[2] Islamic Azad Univ, Dept Elect Engn, Lahijan Branch, Lahijan, Iran
关键词
Under frequency load shedding (UFLS); Post load-shedding corrective actions (PLSA); Voltage instability; Load profile; Static VAR compensator (SVC); POWER-SYSTEMS; SCHEME; UFLS;
D O I
10.1016/j.epsr.2020.106366
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The conventional under frequency load shedding (UFLS) strategies disconnect the preset amount of the load from the power grid in specific steps. These approaches ignore the daily load variations and the total outage costs, leading to a non-optimal solution. This paper proposes an adaptive UFLS scheme that considers the daily profiles of the different load types to minimize the total outage cost. To obtain the exact amount of the load to be shed, the dynamic performance of the load clusters is modeled. Furthermore, a series of post load-shedding corrective actions (PLSA) are implemented after the UFLS to satisfy the voltage constraints, using the installed reactive power control apparatus and static VAR compensators (SVCs). Two static (frequency-domain) and transient (time-domain) indexes are defined to evaluate the feasibility of possible UFLS/PLSA scenarios. The promising solutions are ranked and the most favorable ones are embedded in a number of look-up tables. The proposed UFLS/PLSA approach is applied to the main grid as well as the potential islands. The performance of the proposed adaptive UFLS/PLSA approach is tested on the IEEE 39-bus system via numerous scenarios, and the results show feasibility, fast and optimal performance of the proposed method.
引用
收藏
页数:18
相关论文
共 30 条
[1]   Probabilistic Under Frequency Load Shedding Considering RoCoF Relays of Distributed Generators [J].
Amraee, Turaj ;
Darebaghi, Mohammad Ghaderi ;
Soroudi, Alireza ;
Keane, Andrew .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (04) :3587-3598
[2]  
[Anonymous], 2016, 42152005 IEEE, P1
[3]  
[Anonymous], 2007, C3720071551172007 IE, P1
[4]   Semi-Adaptive Setting of Under Frequency Load Shedding Relays Considering Credible Generation Outage Scenarios [J].
Banijamali, Seyed Sohrab ;
Amraee, Turaj .
IEEE TRANSACTIONS ON POWER DELIVERY, 2019, 34 (03) :1098-1108
[5]   Time-series models for reliability evaluation of power systems including wind energy [J].
Billinton, R ;
Chen, H ;
Ghajar, R .
MICROELECTRONICS AND RELIABILITY, 1996, 36 (09) :1253-1261
[6]   Model Structure Choice for a Static VAR Compensator Under Modeling Uncertainty and Incomplete Information [J].
Bogodorova, Tetiana ;
Vanfretti, Luigi .
IEEE ACCESS, 2017, 5 :22657-22666
[7]  
Celli G, 2009, 2009 IEEE BUCHAREST POWERTECH, VOLS 1-5, P1084
[8]   Mitigating Voltage and Frequency Fluctuation in Microgrids Using Electric Springs [J].
Chen, Xia ;
Hou, Yunhe ;
Tan, Siew-Chong ;
Lee, Chi-Kwan ;
Hui, Shu Yuen Ron .
IEEE TRANSACTIONS ON SMART GRID, 2015, 6 (02) :508-515
[9]  
Eremia Mircea., 2013, HDB ELECT POWER SYST
[10]   Online Parameter Estimation of a Transient Induction Generator Model Based on the Hybrid Method [J].
Farias, Ecyo R. C. ;
Cari, Elmer P. T. ;
Erlich, Istvan ;
Shewarega, Fekadu .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2018, 33 (03) :1529-1538