This paper is the result of an investigation into the use of contingency in smaller construction firms. It summarizes recent literature classifying construction contract risks and mitigation measures. Eight major classifications are used to organize the types of risk found in the literature. The risks are described in detail with associated risk mitigation strategies. Risk modeling techniques are briefly reviewed for their contribution to the risk categorization and contingency estimating. After reviewing the researcher's concepts of risk management in the literature, interviews were conducted with estimators and/or construction managers involved in the bidding process at 12 small to medium construction firms. The purpose of the interviews was to investigate the current risk management practices of small and medium size construction firms. The times when smaller companies used contingency had specific interest for the research. The literature findings were compared with important risk factors identified from the interviews. The main conclusion drawn from the comparison was that small to medium size contractors predominately use contingency in those situations where they are construction managers in a reimbursable contract. Generally, they do not use line item contingency in competitive bidding situations. Thus, these firms are assuming proportionally greater business risk than suggested by the literature on contingency.
引用
收藏
页码:101 / 108
页数:8
相关论文
共 50 条
  • [21] VOLUNTARY ASSUMPTION OF RISK
    Bohlen, Francis H.
    HARVARD LAW REVIEW, 1906, 20 (02) : 91 - 115
  • [22] Reflections on assumption of risk
    Simons, KW
    UCLA LAW REVIEW, 2002, 50 (02) : 481 - 529
  • [23] ASSUMPTION OF RISK AND THE LANDOWNER
    Keeton, W. Page
    TEXAS LAW REVIEW, 1942, 20 (05) : P562 - P574
  • [24] VOLUNTARY ASSUMPTION OF RISK
    Bohlen, Francis H.
    HARVARD LAW REVIEW, 1906, 20 (01) : 14 - 34
  • [25] APPROXIMATE CONTROLLABILITY OF RIEMANN-LIOUVILLE FRACTIONAL EVOLUTION EQUATIONS WITH INTEGRAL CONTRACTOR ASSUMPTION
    Zhu, Shouguo
    Fan, Zhenbin
    Li, Gang
    JOURNAL OF APPLIED ANALYSIS AND COMPUTATION, 2018, 8 (02): : 532 - 548
  • [26] EMPLOYEE RESOURCING for a medium-large UK contractor
    Raiden, AB
    Dainty, ARJ
    Neale, RH
    CONSTRUCTION INNOVATION AND GLOBAL COMPETITIVENESS, VOLS 1 AND 2: THE ORGANIZATION AND MANAGEMENT OF CONSTRUCTION, 2003, : 1429 - 1445
  • [27] A Case Study of a Negotiated Tender within a Small-to-Medium Construction Contractor: Modelling Project Cost Variance
    Ellis, James
    Edwards, David John
    Thwala, Wellington Didibhuku
    Ejohwomu, Obuks
    Ameyaw, Ernest Effah
    Shelbourn, Mark
    BUILDINGS, 2021, 11 (06)
  • [28] Contingency Release During Project Execution: The Contractor's Decision-Making Dilemma
    Ayub, Bilal
    Thaheem, Muhammad Jamaluddin
    Ullah, Fahim
    PROJECT MANAGEMENT JOURNAL, 2019, 50 (06) : 734 - 748
  • [29] Warranty of specification - Shifting risk to the contractor
    Loulakis, MC
    Santiago, SJ
    CIVIL ENGINEERING, 1997, 67 (11): : 33 - 33
  • [30] Cost Performance and Cost Contingency during Project Execution: Comparing Client and Contractor Perspectives
    Hoseini, Erfan
    van Veen, Pim
    Bosch-Rekveldt, Marian
    Hertogh, Marcel
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (04)