Performance analysis of combined cycle power plants: A case study

被引:101
|
作者
Ersayin, Erdem [1 ]
Ozgener, Leyla [2 ]
机构
[1] Celal Bayar Univ, Grad Sch Nat & Appl Sci, Dept Mech Engn Branch, TR-45140 Muradiye, Manisa, Turkey
[2] Celal Bayar Univ, Fac Engn, Dept Mech Engn, TR-45140 Muradiye, Manisa, Turkey
关键词
Combined cycle; Efficiency; Energy; Exergy; GAS-TURBINE; EXERGOECONOMIC ANALYSIS; ENERGY; EXERGY; THERMODYNAMICS; OPTIMIZATION;
D O I
10.1016/j.rser.2014.11.082
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Nowadays the difference between the supply and demand of energy continuously rises. Thus finding new energy resources and also using present resources more efficiently are the key concepts of the new century. One of the ways to use energy resources more efficient is to produce electrical energy from combined cycle power plants. In order to maintain the efficient operating conditions of the plants, performing performance analysis is a requirement. In this study a performance analysis of an operating power plant is performed with actual operating data acquired from power plant control unit. The analysis is performed by using first and second law thermodynamics. Energy and exergy efficiencies of the each component of the power plant system are calculated and also parametric analysis is performed. After applying first law and second law of thermodynamics, energy and exergy efficiencies of the combined cycle power plant are found as 56% and 50.04% respectively and it is found that combustion chamber has the most exergy destruction rate among the system components. According to the calculation results, improvement and modification suggestions are presented. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:832 / 842
页数:11
相关论文
共 50 条
  • [41] Effect of a real steam turbine on thermoeconomic analysis of combined cycle power plants
    Carcasci, Carlo
    Cosi, Lorenzo
    Ferraro, Riccardo
    Pacifici, Beniamino
    ENERGY, 2017, 138 : 32 - 47
  • [42] Analyzing global research trends in combined cycle power plants: A bibliometric study
    Elwardany, Mohamed
    Nassib, A. M.
    Mohamed, Hany A.
    ENERGY NEXUS, 2024, 13
  • [43] Performance enhancement of a combined cycle using heat exchanger bypass control: A thermodynamic investigation
    Khan, M. N.
    Tlili, I.
    JOURNAL OF CLEANER PRODUCTION, 2018, 192 : 443 - 452
  • [44] Comparative performance study of an integrated air-cycle refrigeration and power generation system
    Islam, Shahid
    Dincer, Ibrahim
    APPLIED THERMAL ENGINEERING, 2016, 106 : 493 - 505
  • [45] Evaluation of a process simulator for modelling and analysis of Rankine cycle steam power plants
    Brammer, Naomi R.
    Hessami, Mir-Akbar
    INTERNATIONAL JOURNAL OF EXERGY, 2008, 5 (02) : 177 - 192
  • [46] Performance Analysis of a Reheat-cycle Gas Turbine for Combined Cycle Power Plants Using a Simulation Software for Chemical Process Plants
    Park, Min Ki
    Sohn, Jeong Lak
    Ro, Sung Tack
    TRANSACTIONS OF THE KOREAN SOCIETY OF MECHANICAL ENGINEERS B, 2006, 30 (05) : 472 - 479
  • [47] Performance study of supplying cooling load and output power combined cycle using the cold energy of the small scale LNG
    Ning, Jinghong
    Sun, Zhili
    Dong, Qiang
    Liu, Xinghua
    ENERGY, 2019, 172 : 36 - 44
  • [48] Comparative studies of augmentation in combined cycle power plants
    Srinivas, Tangellapalli
    Reddy, Bale Viswanadha
    INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2014, 38 (09) : 1201 - 1213
  • [49] Thermodynamic analysis and performance improvement of Irem geothermal power plant in Turkey: A case study of organic Rankine cycle
    Unverdi, Murat
    Cerci, Yunus
    ENVIRONMENTAL PROGRESS & SUSTAINABLE ENERGY, 2018, 37 (04) : 1523 - 1539
  • [50] Preliminary design and part-load performance analysis of a recompression supercritical carbon dioxide cycle combined with a transcritical carbon dioxide cycle
    Fan, Gang
    Li, Hang
    Du, Yang
    Chen, Kang
    Zheng, Shaoxiong
    Dai, Yiping
    ENERGY CONVERSION AND MANAGEMENT, 2020, 212