Lessons Learned, Barriers, and Improvement Factors for Mega Building Construction Projects in Developing Countries: Review Study

被引:13
作者
Abu Aisheh, Yazan Issa [1 ]
机构
[1] Middle East Univ, Civil Engn Dept, Amman 11831, Jordan
关键词
mega building construction projects; developing countries; construction projects barriers; construction improvement factors; contractor; lessons learned in construction; supervision staff; owner; DELAY CAUSES; MANAGEMENT; SAFETY; MEGAPROJECTS; PERFORMANCE; CONTRACTORS; SYSTEM; COST;
D O I
10.3390/su131910678
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A mega-project is a major project or a group of projects of significant cost that attract a high level of public attention or political interest because of substantial direct and indirect impacts on the community, environment, and state budget. Capturing and sharing the knowledge from the performance of the current mega projects is essential in order to avoid losing vital corporate knowledge assets in the construction industry. The learned lessons are gained from experience, success, and failure for improving future performance. This research aims to review and read out the lessons learned from 77 research papers that have dealt with the barriers that hinder the successful performance of mega building construction projects in developing countries, identify and classify the main obstacles, and propose improvements for successful implementation and management of mega building construction projects. The results of this paper will help project owners, construction companies, and other stakeholders in developing countries to overcome the limitations in the execution of mega building construction projects.
引用
收藏
页数:17
相关论文
共 74 条
[1]   Health and safety improvement in construction projects: a lean construction approach [J].
Abu Aisheh, Yazan Issa ;
Tayeh, Bassam A. ;
Alaloul, Wesam Salah ;
Almalki, Ali .
INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2022, 28 (04) :1981-1993
[2]   Conflicting factors in construction projects: Korean perspective [J].
Acharya, Nirmal ;
Lee, Young ;
Im, Hae .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2006, 13 (06) :543-+
[3]   Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications [J].
Adam, Abderisak ;
Josephson, Per-Erik Bertil ;
Lindahl, Goran .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (03) :393-406
[4]  
Adnan H., 2009, ASIAN SOCIAL SCI, V4, DOI [10.5539/ass.v4n6p99, DOI 10.5539/ASS.V4N6P99]
[5]  
Al-Emad N., 2018, MATEC WEB C
[6]   Causes of delays in Saudi Arabian public sector construction projects [J].
Al-Kharashi, Adel ;
Skitmore, Martin .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (01) :3-23
[7]   Contractors' perception of the use of costs of quality system in Malaysian building construction projects [J].
Al-Tmeemy, Samiaah M. Hassen ;
Abdul-Rahman, Hamzah ;
Harun, Zakaria .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (07) :827-838
[8]   A comprehensive review of disputes prevention and resolution in construction projects [J].
Alaloul, Wesam S. ;
Hasaniyah, Mohammed W. ;
Tayeh, Bassam A. .
2ND CONFERENCE FOR CIVIL ENGINEERING RESEARCH NETWORKS (CONCERN-2 2018), 2019, 270
[9]  
Albhaisi MA., 2016, INT J ENG MANAG RES, V6, P262
[10]  
Ali A, 2018, ABC RES ALERT, V6, DOI [10.18034/abcra.v6i3.332, DOI 10.18034/ABCRA.V6I3.332]