Ranking investment projects

被引:67
作者
Foster, JE
Mitra, T [1 ]
机构
[1] Cornell Univ, Dept Econ, Ithaca, NY 14853 USA
[2] Vanderbilt Univ, Dept Econ, Nashville, TN 37235 USA
关键词
investment projects; present value; stochastic dominance; polynomials; rate of return over cost; time dominance;
D O I
10.1007/s00199-002-0339-y
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper describes conditions under which one investment project dominates a second project in terms of net present value, irrespective of the choice of the discount rate. The resulting partial ordering of projects has certain similarities to stochastic dominance. However, the structure of the net present value function leads to characterizations that are quite specific to this context. Our theorems use Bernstein's (1915) innovative results on the representation and approximation of polynomials, as well as other general results from the theory of equations, to characterize the partial ordering. We also show how the ranking is altered when the range of discount rates is limited or the rate varies period by period.
引用
收藏
页码:469 / 494
页数:26
相关论文
共 36 条
[1]  
*AC SCI USSR, 1952, COLL PAP SN BERNST, V1
[2]  
Alchian AA, 1955, AM ECON REV, V45, P938
[3]  
[Anonymous], 1997, EC INEQUALITY EXPAND
[4]  
[Anonymous], 1966, APPROXIMATION FUNCTI
[5]  
Aronson J.R, 1985, PUBLIC FINANCE
[6]  
Bawa VS., 1975, Journal of Financial Economics, V2, P95, DOI DOI 10.1016/0304-405X(75)90025-2
[7]  
BERNSTEIN S, 1913, LECONS PRINCIPES ANA, V2
[8]  
Bernstein S, 1915, SOOBSHCH HARK MAT OB, V2, P227
[9]  
BIERMAN H, 1980, CAPITAL BUDGETING DE
[10]   CAPITAL-BUDGETING WITH UNSPECIFIED DISCOUNT RATES [J].
BOHREN, O ;
HANSEN, T .
SCANDINAVIAN JOURNAL OF ECONOMICS, 1980, 82 (01) :45-58