Parallel disassembly sequencing with sequence-dependent operation times

被引:87
作者
Kang, JG [1 ]
Lee, DH
Xirouchakis, P
Persson, JG
机构
[1] Swiss Fed Inst Technol, Dept Mech Engn, Lab Comp Aided Design & Prod, EPFL,LICP, CH-1015 Lausanne, Switzerland
[2] Royal Inst Technol, Dept Machine Design, KTH, Stockholm, Sweden
关键词
disassembly; sequencing; environment;
D O I
10.1016/S0007-8506(07)62136-2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper focuses on the disassembly sequencing, which is the problem of determining the disassembly level and the corresponding disassembly sequence for a product at its end-of-life with the objective of maximizing the overall profit. Parallel disassembly and sequence-dependent operation times are considered by developing an extended process graph obtained from a transformation of a conventional AND/OR graph. Then, an integer programming formulation is developed with precedence constraints that allows its resolution with standard techniques. Finally, an optimal solution is obtained, with a reasonable amount of computation time, for an industrial application of a subassembly of a copy machine.
引用
收藏
页码:343 / 346
页数:4
相关论文
共 11 条