Two-stage sequence generation for partial disassembly of products with sequence dependent task times

被引:9
|
作者
Riggs, Robert J. [1 ,2 ]
Jin, Xiaoning [3 ]
Hub, S. Jack [2 ,3 ]
机构
[1] Clemson Univ, Dept Ind Engn, Clemson, SC 29634 USA
[2] Univ Michigan, Dept Ind & Operat Engn, Ann Arbor, MI 48109 USA
[3] Univ Michigan, Dept Mech Engn, Ann Arbor, MI 48109 USA
来源
22ND CIRP CONFERENCE ON LIFE CYCLE ENGINEERING | 2015年 / 29卷
关键词
disassembly sequence generation; end of life (EOL); partial disassembly; sequence dependent task times; LINE BALANCING PROBLEM; OPTIMIZATION; ALGORITHM;
D O I
10.1016/j.procir.2015.02.047
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
For disassembly sequence generation, partial disassembly and sequence dependent task times are typically not considered together in the same model. We developed a two-stage optimization program that first determines the optimal partial disassembly sequence according to reuse value only, followed by the second stage that finds the optimal partial disassembly sequence that also includes sequence dependence task times. We prove the optimality of the two-stage approach under the condition that all components with any positive reuse value must be included in the final sequence. If this condition does not need to be met, a task hedging policy is shown to be effective. (C) 2015 The Authors. Published by Elsevier B.V.
引用
收藏
页码:698 / 703
页数:6
相关论文
共 50 条
  • [21] Product cooperative disassembly sequence and task planning based on genetic algorithm
    Tian, Yongting
    Zhang, Xiufen
    Liu, Zehua
    Jiang, Xingyue
    Xue, Junfang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 105 (5-6) : 2103 - 2120
  • [22] Generation of possible multiple components disassembly sequence for maintenance using a disassembly constraint graph
    Li, JR
    Khoo, LP
    Tor, SB
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 102 (01) : 51 - 65
  • [23] SEQUENCE-DEPENDENT ROBOTIC DISASSEMBLY LINE BALANCING PROBLEM CONSIDERING DISASSEMBLY PATH
    Chen, Qinglian
    Yao, Bitao
    Duc Truong Pham
    PROCEEDINGS OF THE ASME 2020 15TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE (MSEC2020), VOL 2B, 2020,
  • [24] Optimizing disassembly processes subjected to sequence-dependent cost
    Lambert, A. J. D.
    COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (02) : 536 - 551
  • [25] Partial Disassembly Line Balancing Problem Analysis Based on Sequence-Dependent Stochastic Mixed-Flow
    Xia, Xuhui
    Liu, Wei
    Zhang, Zelin
    Wang, Lei
    JOURNAL OF COMPUTING AND INFORMATION SCIENCE IN ENGINEERING, 2020, 20 (06)
  • [26] Profit-oriented balancing of two-sided disassembly lines with resource-dependent task times
    Demiralay, Yuksel Degirmencioglu
    Kara, Yakup
    ROBOTIC INTELLIGENCE AND AUTOMATION, 2024, 44 (06): : 910 - 921
  • [27] Automation disassembly sequence generation based on visual recognition and rules in remanufacturing
    Gu, Tianhang
    PROCEEDINGS OF THE 2021 IEEE 16TH CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA 2021), 2021, : 428 - 433
  • [28] Two approaches to handle the dynamism in a scheduling problem with sequence-dependent setup times
    Angel-Bello, Francisco
    Vallikavungal, Jobish
    Alvarez, Ada
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 167
  • [29] A tabu search algorithm for balancing a sequence-dependent disassembly line
    Kalayci, Can B.
    Gupta, Surendra M.
    PRODUCTION PLANNING & CONTROL, 2014, 25 (02) : 149 - 160
  • [30] Two-Stage Surrogate Assisted Differential Evolution for Optimization of a Non-Circular Drawing Sequence
    Pholdee, Nantiwat
    Bureerat, Sujin
    Baek, Hyun Moo
    Im, Yong-Taek
    INTERNATIONAL JOURNAL OF PRECISION ENGINEERING AND MANUFACTURING, 2017, 18 (04) : 567 - 573