Examination of communication processes in design-build project delivery in building construction

被引:11
作者
Tran, Dai Q. [1 ]
Long Duy Nguyen [2 ]
Faught, Allen [1 ]
机构
[1] Univ Kansas, Dept Civil Environm & Architectural Engn, Lawrence, KS 66045 USA
[2] Florida Gulf Coast Univ, Dept Environm & Civil Engn, Ft Myers, FL USA
关键词
Project teams; USA; Construction; Communication; Design-build; SELECTION;
D O I
10.1108/ECAM-12-2015-0192
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Design-Build (D-B) is a project delivery method in which the owner procures both design and construction services in the same contract from a single legal entity. There is limited research on how communication among parties influences the success of D-B projects. The purpose of this paper is to examine D-B communication issues and provides effective practices on communication to improve D-B procurement processes in the USA. Design/methodology/approach - The research methodology for this study includes a comprehensive review of literature, survey questionnaire, and structured interviews. A questionnaire was developed to collect data from professionals with an average of 23 years of experience related to D-B procurement. Eight structured interviews were conducted to verify and validate the survey questionnaire results. Findings - The results showed that the communication issues vary along with each phase of the D-B process. The primary communication practices influencing the success of D-B projects are: establishing clear points of contact; providing clear and understandable information among stakeholders during the D-B process; and the timely sharing of information to all stakeholders. Research limitations/implications - The chief limitation of this research is that the primary data were mostly opinions from experts although several empirical data were collected for cross-validation. This research did not consider the relationship of relevant contract clauses and communication issues. Practical implications - The findings from this paper will help professionals better understand the D-B procurement process. Originality/value - This is one of the first attempts to discuss D-B communication issues in each different phase of a D-B project.
引用
收藏
页码:1319 / 1336
页数:18
相关论文
共 36 条
  • [1] [Anonymous], 1988, PROJECT MANAGEMENT J
  • [2] [Anonymous], 2012, PRIM PROJ DEL
  • [3] Ashley D.B., 1987, PROJ MANAG J, V18, P69
  • [4] Beard J., 2001, DESIGN BUILD PLANNIN
  • [5] Managing projects with distributed and embedded knowledge through interactions
    Bosch-Sijtsema, Petra M.
    Henriksson, Lars-Henrik
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (08) : 1432 - 1444
  • [6] Chan E. H. W., 2005, International Journal of Project Management, V23, P630, DOI 10.1016/j.ijproman.2005.05.004
  • [7] Design and construction coordination problems and planning for design-build project new users
    Chang, Andrew S.
    Shen, Fang-Ying
    Ibbs, William
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (12) : 1525 - 1534
  • [8] Cross-organization process integration in design-build team
    Cheng, Min-Yuan
    Tsai, Ming-Hsiu
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 17 (02) : 151 - 162
  • [9] Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea
    Cho, KyuMan
    Hyun, ChangTaek
    Koo, KyoJin
    Hong, TaeHoon
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (01) : 19 - 29
  • [10] Exploring effectiveness of team communication Balancing synchronous and asynchronous communication in design teams
    den Otter, Ad
    Emmitt, Stephen
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (05) : 408 - +