Financial risk assessment and modelling of PPP based Indian highway infrastructure projects

被引:98
作者
Kumar, Lakshya [1 ]
Jindal, Apurva [1 ]
Velaga, Nagendra R. [2 ]
机构
[1] Indian Inst Technol IIT Bombay, Civil Engn Dept, Bombay 400076, Maharashtra, India
[2] Indian Inst Technol, Civil Engn Dept, Transportat Syst Engn, Bombay 400076, Maharashtra, India
关键词
NPV-at-risk; PPP; Uncertainties; Highway infrastructure; Monte Carlo Simulation; Project cost; Investment risk; Financial analysis; GUARANTEES; OPTIONS;
D O I
10.1016/j.tranpol.2017.03.010
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper investigates financial risk associated with highway infrastructure projects by identifying parameters such as traffic flow and project cost; and further models the risk by analysing real-world PPP based highway projects in India. It applies the Net Present Value (NPV)-at-risk model tool which uses Monte Carlo Simulation taking into account the probability distributions for different input parameters, and gives uncertainty associated with NPV. Further, the model is applied to 30 real-world BOT highway projects to identify critical risks and discuss mitigation strategies. The critical contribution of the paper is towards applying a standard risk-analysis model (NPV-at-risk tool supported by Monte Carlo Simulation) to the real-world PPP based highway infrastructure projects. The application of the developed model can be used as a decision tool to judge the profitability of a project and make investment decisions in the bidding phase by the private investors. It also helps in identifying which source of uncertainty has the most influence on the project's financial returns and what is the actual relationship between the critical influencing parameters and associated NPV; this will be helpful to government agencies and public authorities to identify the factors that have largest impacts and consider the corresponding mitigation strategies.
引用
收藏
页码:2 / 11
页数:10
相关论文
共 25 条
[1]  
[Anonymous], 2012, PROJ INV APPR SUST V
[2]  
[Anonymous], 2008, World Bank report
[3]  
[Anonymous], 2009, REP COMM SECR REV TO
[4]  
[Anonymous], 2012, PUBL PRIV PARTN IND
[5]   Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options [J].
Ashuri, B. ;
Kashani, H. ;
Molenaar, K. R. ;
Lee, S. ;
Lu, J. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (04) :545-557
[6]  
Atrill p., 2014, Accounting and Finance: an introduction, V7th
[7]  
Attarzadeh M., 2011, RISK, P360
[8]   Traffic and revenue forecast at risk for a BOT road project [J].
Bagui, Swapan Kumar ;
Ghosh, Ambarish .
KSCE JOURNAL OF CIVIL ENGINEERING, 2012, 16 (06) :905-912
[9]  
Delmon J., 2011, PUBLIC PRIVATE PARTN
[10]  
Ernst Young, 2012, PUBL PRIV PARTN NEXT