[3] Omron Corp Ind Automat Co, Prod Management & Syst Engn Grp, Kusatsu 5250035, Japan
来源:
LEAN BUSINESS SYSTEMS AND BEYOND
|
2008年
/
257卷
关键词:
D O I:
暂无
中图分类号:
F [经济];
学科分类号:
02 ;
摘要:
Cell manufacturing is widely introduced to cope with the dynamically changing market demands. This study considers a scheduling method for it cell assembly system for the products that are characterized by the type and specification. A. major set up is required at a cell for the change of types and a minor one for the change of specification within the same types. The scheduling will be made in three folds. Firstly, the scheduling for the orders with due dates of the day is made before the processing of the day starts. If cells have slack times for the production of the orders of the day, express orders to be completed within the day will be accepted in a prespecified time period or until no cells become available for the production. If slack times still exist, advanced production of orders with future due dates will be considered. Auction-based algorithms are proposed for the scheduling and their effectiveness is investigated by simulation studies.