Impact of integration management on construction project management performance

被引:136
作者
Demirkesen, Sevilay [1 ]
Ozorhon, Beliz [2 ]
机构
[1] Univ Calif Berkeley, Dept Civil & Environm Engn, Berkeley, CA 94720 USA
[2] Bogazici Univ, Dept Civil Engn, TR-34342 Istanbul, Turkey
关键词
Integration management; Project management performance; Construction projects; RESEARCH-AND-DEVELOPMENT; CONFIRMATORY FACTOR-ANALYSIS; CRITICAL SUCCESS FACTORS; KNOWLEDGE INTEGRATION; SUPPLY CHAIN; INFORMATION-TECHNOLOGY; PORTFOLIO MANAGEMENT; CAPABILITY; INNOVATION; FRAMEWORK;
D O I
10.1016/j.ijproman.2017.09.008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Construction project performance relies on different dimensions of project management. Among those, integration management is of paramount importance since effective project management starts with the integration of processes and people within a construction project. This study investigates the influence of various components of integration management on construction project management performance and quantifies the relationship between those components and integration management. The proposed components of integration management are the development of a project charter, knowledge integration, process integration, staff integration, supply chain integration, and integration of changes; whereas the dimensions of project management performance are time, cost, quality, safety, and client satisfaction. A questionnaire was designed and administered to construction professionals and data from 121 projects was analyzed using structural equation modeling. The data was analyzed by using software, called SPSS AMOS. The findings of the research indicate that integration management has a strong impact on project management performance. The study contributes to the project management body of knowledge in that it develops a conceptual framework consisting of specific components for integration management, reveals the impact of integration management on performance, and proposes several tools and strategies for enabling effective integration along the project life cycle. Industry practitioners may benefit from the framework developed by considering the components proposed and following strategies recommended for construction phases. (C) 2017 Elsevier Ltd. APM and IPMA. All rights reserved.
引用
收藏
页码:1639 / 1654
页数:16
相关论文
共 144 条
  • [1] Akanni P.O., 2015, NIGERIA HBRC J, V11, P91, DOI DOI 10.1016/J.HBRCJ.2014.02.010
  • [2] Ali H.A. E. M., 2013, Journal of King Saud University - Engineering Sciences, V25, P125, DOI [DOI 10.1016/J.JKSUES.2012.03.002, 10.1016/j.jksues.2012.03.002]
  • [3] A different paradigm for the initial colonisation of Sahul
    Allen, Jim
    O'Connell, James F.
    [J]. ARCHAEOLOGY IN OCEANIA, 2020, 55 (01) : 1 - 14
  • [4] Linking project health to project performance indicators: Multiple case studies of construction projects in Saudi Arabia
    Almahmoud, Essam Salem
    Doloi, Hemanta Kumar
    Panuwatwanich, Kriengsak
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (03) : 296 - 307
  • [5] [Anonymous], THESIS
  • [6] [Anonymous], P 2000 IEEE INT C MA
  • [7] [Anonymous], VISITING SPEAKER SER
  • [8] [Anonymous], 2002, INT J PROJECT MANAGE
  • [9] [Anonymous], INT C FIN MAN EC
  • [10] [Anonymous], 1990, J MANAGE ENG, DOI DOI 10.1061/(ASCE)9742-597X(1990)6:1(47)