In this paper, a Mixed-Integer Linear Programming (MILP) model to simultaneously schedule jobs and transporters in a flexible flow shop system is suggested. Wherein multiple jobs, finite transporters, and stages with parallel unrelated machines are considered. In addition to the mentioned technicalities, the jobs are able to omit one or more stages, and may not be executable by all the machines, and similarly, transportable by all the transporters. To the best of our knowledge, no study in the literature has featured efficacy of the parallel computing in simultaneous scheduling of jobs and transporters in the flexible flow shop system which remarkably shortens run time if the solution approaches are designed accordingly. To this end, we employ Gurobi solver, Parallel Genetic Algorithm (PGA), Parallel Particle Swarm Optimization (PPSO) and hybrid Parallel PSO-GA Algorithm (PPSOGA) to deal with the problem instances. Furthermore, a parallel version of Ant Colony Optimization (ACO) algorithm adapted from the state-of-the-art literature is developed to verify the performance of our suggested solution methods. Using 60 problem instances generated via uniform distribution, the suggested solution approaches are compared against one another. After assessing the results of the computational experiments, it is deduced that PPSOGA algorithm outperforms PGA, PPSO, Parallel Ant Colony Optimization (PACO) and Gurobi solver in terms of the quality of the solutions. The efficiency and run time of the suggested approaches are then assessed through two prominent statistical tests (i.e., Wald and Analysis of Variance (ANOVA)). Eventually, it comes to spotlight that PPSOGA algorithm is computationally rewarding and dependable.
机构:
Gaziantep Univ, Dept Ind Engn, Fac Engn, Gaziantep, Turkey
Dokuz Eylul Univ, Dept Ind Engn, Fac Engn, Izmir, TurkeyGaziantep Univ, Dept Ind Engn, Fac Engn, Gaziantep, Turkey
Elmi, Atabak
Topaloglu, Seyda
论文数: 0引用数: 0
h-index: 0
机构:
Dokuz Eylul Univ, Dept Ind Engn, Fac Engn, Izmir, TurkeyGaziantep Univ, Dept Ind Engn, Fac Engn, Gaziantep, Turkey
机构:
Qazvin Islamic Azad Univ QIAU, Fac Ind & Mech Engn, Dept Ind Engn, Qazvin, IranQazvin Islamic Azad Univ QIAU, Fac Ind & Mech Engn, Dept Ind Engn, Qazvin, Iran
Gheisariha, Elmira
论文数: 引用数:
h-index:
机构:
Tavana, Madjid
Jolai, Fariborz
论文数: 0引用数: 0
h-index: 0
机构:
Univ Tehran, Dept Ind Engn, Tehran, IranQazvin Islamic Azad Univ QIAU, Fac Ind & Mech Engn, Dept Ind Engn, Qazvin, Iran
Jolai, Fariborz
Rabiee, Meysam
论文数: 0引用数: 0
h-index: 0
机构:
Univ Oregon, Lundquist Coll Business, Eugene, OR 97403 USAQazvin Islamic Azad Univ QIAU, Fac Ind & Mech Engn, Dept Ind Engn, Qazvin, Iran
机构:
Gaziantep Univ, Dept Ind Engn, Fac Engn, Gaziantep, Turkey
Dokuz Eylul Univ, Dept Ind Engn, Fac Engn, Izmir, TurkeyGaziantep Univ, Dept Ind Engn, Fac Engn, Gaziantep, Turkey
Elmi, Atabak
Topaloglu, Seyda
论文数: 0引用数: 0
h-index: 0
机构:
Dokuz Eylul Univ, Dept Ind Engn, Fac Engn, Izmir, TurkeyGaziantep Univ, Dept Ind Engn, Fac Engn, Gaziantep, Turkey
机构:
Qazvin Islamic Azad Univ QIAU, Fac Ind & Mech Engn, Dept Ind Engn, Qazvin, IranQazvin Islamic Azad Univ QIAU, Fac Ind & Mech Engn, Dept Ind Engn, Qazvin, Iran
Gheisariha, Elmira
论文数: 引用数:
h-index:
机构:
Tavana, Madjid
Jolai, Fariborz
论文数: 0引用数: 0
h-index: 0
机构:
Univ Tehran, Dept Ind Engn, Tehran, IranQazvin Islamic Azad Univ QIAU, Fac Ind & Mech Engn, Dept Ind Engn, Qazvin, Iran
Jolai, Fariborz
Rabiee, Meysam
论文数: 0引用数: 0
h-index: 0
机构:
Univ Oregon, Lundquist Coll Business, Eugene, OR 97403 USAQazvin Islamic Azad Univ QIAU, Fac Ind & Mech Engn, Dept Ind Engn, Qazvin, Iran