A parallel hybrid PSO-GA algorithm for the flexible flow-shop scheduling with transportation

被引:62
作者
Amirteimoori, Arash [1 ]
Mahdavi, Iraj [2 ]
Solimanpur, Maghsud [3 ]
Ali, Sadia Samar [4 ]
Tirkolaee, Erfan Babaee [5 ]
机构
[1] London Sch Econ & Polit Sci, Dept Math, London, England
[2] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol, Iran
[3] Urmia Univ, Dept Ind Engn, Orumiyeh, Iran
[4] King Abdulaziz Univ, Fac Engn, Dept Ind Engn, Jeddah, Saudi Arabia
[5] Istinye Univ, Dept Ind Engn, Istanbul, Turkey
关键词
Flexible flow shop scheduling; Metaheuristics; Mixed-integer linear programming; Parallel computing; Hybrid parallel PSO-GA algorithm; HEURISTIC ALGORITHMS; 2-MACHINE FLOWSHOP; SHOP; TIME; OPTIMIZATION; 2-STAGE; SEARCH; SETUP;
D O I
10.1016/j.cie.2022.108672
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, a Mixed-Integer Linear Programming (MILP) model to simultaneously schedule jobs and transporters in a flexible flow shop system is suggested. Wherein multiple jobs, finite transporters, and stages with parallel unrelated machines are considered. In addition to the mentioned technicalities, the jobs are able to omit one or more stages, and may not be executable by all the machines, and similarly, transportable by all the transporters. To the best of our knowledge, no study in the literature has featured efficacy of the parallel computing in simultaneous scheduling of jobs and transporters in the flexible flow shop system which remarkably shortens run time if the solution approaches are designed accordingly. To this end, we employ Gurobi solver, Parallel Genetic Algorithm (PGA), Parallel Particle Swarm Optimization (PPSO) and hybrid Parallel PSO-GA Algorithm (PPSOGA) to deal with the problem instances. Furthermore, a parallel version of Ant Colony Optimization (ACO) algorithm adapted from the state-of-the-art literature is developed to verify the performance of our suggested solution methods. Using 60 problem instances generated via uniform distribution, the suggested solution approaches are compared against one another. After assessing the results of the computational experiments, it is deduced that PPSOGA algorithm outperforms PGA, PPSO, Parallel Ant Colony Optimization (PACO) and Gurobi solver in terms of the quality of the solutions. The efficiency and run time of the suggested approaches are then assessed through two prominent statistical tests (i.e., Wald and Analysis of Variance (ANOVA)). Eventually, it comes to spotlight that PPSOGA algorithm is computationally rewarding and dependable.
引用
收藏
页数:16
相关论文
共 45 条
[1]   Parallel multi-core hyper-heuristic GRASP to solve permutation flow-shop problem [J].
Alekseeva, Ekaterina ;
Mezmaz, Mohand ;
Tuyttens, Daniel ;
Melab, Nouredine .
CONCURRENCY AND COMPUTATION-PRACTICE & EXPERIENCE, 2017, 29 (09)
[2]   Concurrent scheduling of jobs and AGVs in a flexible job shop system: a parallel hybrid PSO-GA meta-heuristic [J].
Amirteimoori, Arash ;
Kia, Reza .
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2023, 35 (03) :727-753
[3]   Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties [J].
Bank, J ;
Werner, F .
MATHEMATICAL AND COMPUTER MODELLING, 2001, 33 (4-5) :363-383
[4]   Robot move sequence determining and multiple part-type scheduling in hybrid flexible flow shop robotic cells [J].
Batur, G. Didem ;
Erol, Serpil ;
Karasan, Oya Ekin .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 100 :72-87
[5]  
Blum C., 2004, J MATH MODEL ALGORIT, V3, P285, DOI DOI 10.1023/B:JMMA.0000038614.39977.6F
[6]   Parallel tabu search algorithm for the hybrid flow shop problem [J].
Bozejko, Wojciech ;
Pempera, Jaroslaw ;
Smutnicki, Czeslaw .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (03) :466-474
[7]   Complexity results for flow-shop and open-shop scheduling problems with transportation delays [J].
Brucker, P ;
Knust, S ;
Cheng, TCE ;
Shakhlevich, NV .
ANNALS OF OPERATIONS RESEARCH, 2004, 129 (1-4) :81-106
[8]   Multi-objective Optimization of the Distributed Permutation Flow Shop Scheduling Problem with Transportation and Eligibility Constraints [J].
Cai S. ;
Yang K. ;
Liu K. .
Journal of the Operations Research Society of China, 2018, 6 (03) :391-416
[9]   Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line [J].
Choi, Hyun-Seon ;
Kim, Ji-Su ;
Lee, Dong-Ho .
EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (04) :3514-3521
[10]   A simulated annealing with multiple-search paths and parallel computation for a comprehensive flowshop scheduling problem [J].
Defersha, Fantahun M. .
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2015, 22 (04) :669-691