Back-Analysis of Mechanics Parameters of tunnel Based on Particle Swarm Optimization and Numerical Simulation

被引:2
作者
Jiang Annan [1 ]
Li Peng [1 ]
机构
[1] Dalian Maritime Univ, Inst Highway & Bridge, Dalian 116026, Liaoning, Peoples R China
来源
ADVANCED MATERIALS AND COMPUTER SCIENCE, PTS 1-3 | 2011年 / 474-476卷
关键词
Tunnel construction; back-analysis; particle swarm optimization; numerical simulation;
D O I
10.4028/www.scientific.net/KEM.474-476.1373
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
The geological body has uncertainty and complexity characters, therefore the predesign scheme for construction has blindness. Field measurement and back analysis can help identify rock mass parameters in actual engineering field. The paper combines an intelligent optimization arithmetic-particle swarm optimization (PSO) and 3-D fast Lagrange numerical method to construct a parameters back analysis method for underground engineering. The PSO has global robust optimization property and overcomes the conventional optimization method problem of being limited in local optimization. The FISH language is used to develop the PSO arithmetic and is embedded in the business software-FLAC-3D. The method is used in Dalian Metro construction and it proves that this method has not only fast convergence speed but also high prediction. It offers a new idea to geotechnical parameters identification.
引用
收藏
页码:1373 / 1376
页数:4
相关论文
共 5 条
  • [1] Chen Y. M., 2008, FLAC FLAC3D BASIC EN
  • [2] Jiang A. N., 2007, MINING RES DEV, V27, P33
  • [3] Lv A.Z, 1998, ROCK MECH INVERSE PR
  • [4] Yang L.D., 1995, GEOTECHNICAL ENG BAC
  • [5] Yang S.Z., 2006, N WATER TRANSFER PRO, V27, P94