共 50 条
- [47] Determining a production run time for an imperfect production-inventory syst ern with scrap JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2007, 66 (09): : 724 - 735
- [48] A model of an integrated supply chain with imperfect production, product deterioration, and quality inspection errors SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2024, 49 (02):