Constraint programming-based transformation approach for a mixed fuzzy-stochastic resource investment project scheduling problem

被引:6
作者
Subulan, Kemal [1 ]
Cakir, Gizem [2 ]
机构
[1] Dokuz Eylul Univ, Fac Engn, Dept Ind Engn, Izmir, Turkey
[2] Dokuz Eylul Univ, Grad Sch Nat & Appl Sci, Izmir, Turkey
关键词
Resource investment project scheduling problem; Constraint programming; Fuzzy mathematical programs; Scenario-based stochastic programs; ERP implementation projects; OPTIMIZATION MODELS; GENETIC ALGORITHM; UNCERTAINTY; HEURISTICS; SELECTION; SEARCH; RCPSP; RISK;
D O I
10.1007/s00500-021-06399-5
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In fuzzy mathematical programming literature, most of the transformation approaches were mainly focused on integer linear programs (ILPs) with fuzzy parameters/variables. However, ILP-based solution approaches may be inadequate for solving large-scaled combinatorial fuzzy optimization problems, like project scheduling under mixed fuzzy-stochastic environments. Moreover, many real-life project scheduling applications may contain different types of uncertainties such as fuzziness, stochasticity, and dynamism simultaneously. Based on these motivations, this paper presents a novel constraint programming (CP)-based transformation approach for solving a multi-objective and multi-mode, fuzzy-stochastic resource investment project scheduling problem (FS-MRIPSP) which is a well-known NP-complete problem. In fact, the proposed approach mainly depends on a bound and decomposition principle which divides fuzzy components of the problem into the crisp middle, lower, and upper level problems. Thus, it reduces the problem dimension and does not need to use any standard fuzzy arithmetic and ranking operations directly. Furthermore, the stochastic nature of the problem is also taken into account by using a multi-scenario-based stochastic programming technique. Finally, a weighted additive fuzzy goal program is embedded into the proposed CP-based transformation approach to produce compromise fuzzy project schedules that trade-off between expected values of project makespan and total resource usage costs. To show the validity and practicality of the proposed approach, a real-life application is presented for the production-and-operations management module implementation process of an international Enterprise Resource Planning software company. The fuzzy-stochastic project schedules generated by the proposed CP-based approach are also compared to the results of a similar ILP-based method. Computational results have shown that the CP-based approach outperforms the ILP-based method in terms of both solution quality and computational time.
引用
收藏
页码:2523 / 2560
页数:38
相关论文
共 107 条
[1]   A resource flow-based branch-and-bound algorithm to solve fuzzy stochastic resource-constrained project scheduling problem [J].
Alipouri, Yaghoub .
SOFT COMPUTING, 2021, 25 (22) :14315-14331
[2]   Solving the FS-RCPSP with hyper-heuristics: A policy-driven approach [J].
Alipouri, Yagub ;
Sebt, Mohammad Hassan ;
Ardeshir, Abdollah ;
Chan, Weng Tat .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2019, 70 (03) :403-419
[3]   A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem [J].
Alipouri, Yagub ;
Sebt, Mohammad Hassan ;
Ardeshir, Abdollah ;
Zarandi, Mohammad Hossein Fazel .
OPERATIONAL RESEARCH, 2020, 20 (01) :197-217
[4]   A weighted additive fuzzy multiobjective model for the supplier selection problem under price breaks in a supply Chain [J].
Amid, Amin ;
Ghodsypour, S. H. ;
O'Brien, Christopher .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 121 (02) :323-332
[5]  
[Anonymous], 1999, THESIS NORWEGIAN U S
[6]  
[Anonymous], 2005, HUMAN RESOURCES MANA
[7]   Robust optimization for resource-constrained project scheduling with uncertain activity durations [J].
Artigues, Christian ;
Leus, Roel ;
Nobibon, Fabrice Talla .
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) :175-205
[8]  
Artykov D., 2015, INT J AETA NAT SCI P, V4, P47
[9]   New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing [J].
Ashtiani, Behzad ;
Leus, Roel ;
Aryanezhad, Mir-Bahador .
JOURNAL OF SCHEDULING, 2011, 14 (02) :157-171
[10]   Resource-constrained project scheduling problem with multiple execution modes and fuzzy/crisp activity durations [J].
Atli, Omer ;
Kahraman, Cengiz .
JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2014, 26 (04) :2001-2020