共 50 条
- [41] Efficient Nletaheuristic for Multi-Product Disassembly Lot Sizing Problem with Lost Sales 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 740 - 744
- [48] The Robustness of Scheduling Policies in Multi-product Manufacturing Systems with Sequence-dependent Setup Times and Finite Buffers 2012 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), 2012, : 5074 - 5079
- [49] A genetic algorithm for the simultaneous lot sizing and scheduling problem in capacitated flow shop with complex setups and backlogging The International Journal of Advanced Manufacturing Technology, 2014, 70 : 125 - 134
- [50] PRODUCTION SCHEDULING WITH SEQUENCE-DEPENDENT SETUPS AND JOB RELEASE TIMES DYNA-COLOMBIA, 2010, 77 (163): : 260 - 269