Single machine multi-product capacitated lot sizing with sequence-dependent setups

被引:77
|
作者
Almada-Lobo, Bernardo
Klabjan, Diego
Carravilla, Maria Antonia
Oliveira, Jose F.
机构
[1] Univ Porto, Fac Engn, P-4200 Oporto, Portugal
[2] MIT, Cambridge, MA 02139 USA
[3] FEUP, Inst Engn Sist & Computadores, P-4200 Oporto, Portugal
关键词
capacitated lot sizing and scheduling; sequence-dependent setup; integer programming; heuristics; UP CARRYOVER; TIMES; COSTS; FRAMEWORK;
D O I
10.1080/00207540601094465
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In production planning in the glass container industry, machine-dependent setup times and costs are incurred for switch overs from one product to another. The resulting multi-item capacitated lot-sizing problem has sequence-dependent setup times and costs. We present two novel linear mixed-integer programming formulations for this problem, incorporating all the necessary features of setup carryovers. The compact formulation has polynomially many constraints, whereas the stronger formulation uses an exponential number of constraints that can be separated in polynomial time. We also present a five-step heuristic that is effective both in finding a feasible solution (even for tightly capacitated instances) and in producing good solutions to these problems. We report computational experiments.
引用
收藏
页码:4873 / 4894
页数:22
相关论文
共 50 条
  • [21] MULTIPLE-STAGE MULTIPLE-MACHINE CAPACITATED LOT-SIZING AND SCHEDULING WITH SEQUENCE-DEPENDENT SETUP: A CASE STUDY IN THE WHEEL INDUSTRY
    Deeratanasrikul, Lalida
    Mizuno, Shinji
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2017, 13 (01) : 411 - 426
  • [22] Multi-objective Algorithms for the Single Machine Scheduling Problem with Sequence-dependent Family Setups
    Rego, Marcelo Ferreira
    Freitas Souza, Marcone Jamilson
    Claudio Arroyo, Jose Elias
    2012 31ST INTERNATIONAL CONFERENCE OF THE CHILEAN COMPUTER SCIENCE SOCIETY (SCCC 2012), 2012, : 142 - 151
  • [23] Parallel machine, capacitated lot-sizing and scheduling for the pipe-insulation industry
    de Armas, Jesica
    Laguna, Manuel
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (03) : 800 - 817
  • [24] An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics
    Ekici, Ali
    Elyasi, Milad
    Ozener, Okan Orsan
    Sarikaya, Merve Burcu
    COMPUTERS & OPERATIONS RESEARCH, 2019, 111 : 130 - 140
  • [25] Neighborhood search procedures for single machine tardiness scheduling with sequence-dependent setups
    Liao, Ching-Jong
    Tsou, Hsin-Hui
    Huang, Kuo-Ling
    THEORETICAL COMPUTER SCIENCE, 2012, 434 : 45 - 52
  • [26] Single machine scheduling with sequence-dependent family setups to minimize maximum lateness
    Jin, F.
    Gupta, J. N. D.
    Song, S.
    Wu, C.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2010, 61 (07) : 1181 - 1189
  • [27] Solving Multi-item Multi-period Capacitated Lot Sizing Problem with Considerations of Backorders and Setups
    Verma, Mayank
    Sharma, R. R. K.
    2010 2ND INTERNATIONAL CONFERENCE ON COMPUTER AND AUTOMATION ENGINEERING (ICCAE 2010), VOL 4, 2010, : 18 - 22
  • [28] Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration
    Mateus, Geraldo R.
    Ravetti, Martin G.
    de Souza, Mauricio C.
    Valeriano, Tais M.
    JOURNAL OF SCHEDULING, 2010, 13 (03) : 245 - 259
  • [29] Jobshop lot streaming with routing flexibility, sequence-dependent setups, machine release dates and lag time
    Defersha, Fantahun M.
    Chen, Mingyuan
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (08) : 2331 - 2352
  • [30] Multi-product capacitated disassembly lot-sizing problem with lost sales and possibility of defective disassembly components
    Hrouga, M.
    Sbihi, A.
    IFAC PAPERSONLINE, 2022, 55 (10): : 520 - 525