Dynamic multi-stage under frequency load shedding considering uncertainty of generation loss

被引:28
作者
Darebaghi, Mohammad Ghaderi [1 ]
Amraee, Turaj [1 ]
机构
[1] KN Toosi Univ Technol, Dept Elect Engn, PO 14317-14191, Tehran, Iran
关键词
IEEE standards; load shedding; frequency response; statistical distributions; power generation economics; generation loss uncertainty; dynamic multistage under frequency load shedding; dynamic multistage UFLS plan; probabilistic UFLS; IEEE 39-bus test system; BONMIN solver; discretised dynamic system frequency response model; mixed integer linear programming optimisation problem; load curtailment minimisation; point estimate method; continuous probability distribution function; discrete statistical moment; POWER-SYSTEM STABILITY; SCHEMES; ENHANCEMENT;
D O I
10.1049/iet-gtd.2016.0751
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Under frequency load shedding (UFLS) as a special protection scheme is executed to arrest declining frequency. The setting parameters of a multi-stage load shedding plan are determined using a discretised model of dynamic system frequency response considering uncertainty of generation loss. The proposed probabilistic UFLS plan is formulated as a mixed integer linear programming optimisation problem to minimise the expected amount of load curtailment. The uncertainty of the proposed discretised dynamic load shedding plan is modelled using the point estimate method, and the obtained results are compared with those of the Monte-Carlo simulation method (MCSM). The utilised point estimate technique converts the continuous probability distribution functions of the uncertain parameter (i.e. the generation loss) to discrete statistical moments. The proposed probabilistic UFLS is solved using the BONMIN solver. The performance of the proposed dynamic UFLS plan is investigated for the IEEE 39-bus test system.
引用
收藏
页码:3202 / 3209
页数:8
相关论文
共 31 条
[1]   Hardware Implementation of an Automatic Adaptive Centralized Underfrequency Load Shedding Scheme [J].
Abdelwahid, Sarra ;
Babiker, Abubakr ;
Eltom, Ahmed ;
Kobet, Gary .
IEEE TRANSACTIONS ON POWER DELIVERY, 2014, 29 (06) :2664-2673
[2]   AN ADAPTIVE METHOD FOR SETTING UNDERFREQUENCY LOAD SHEDDING RELAYS [J].
ANDERSON, PM ;
MIRHEYDAR, M ;
COULTES, ME ;
TAYLOR, CW ;
RAMEY, DG .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (02) :647-655
[3]  
[Anonymous], 2007, Guide for Field Testing of Relaying Current Transformers, DOI [10.1109/IEEESTD.2007.4299516, DOI 10.1109/IEEESTD.2007.4299516]
[4]  
[Anonymous], 1994, POWER SYSTEM STABILI
[5]   Probability-based approach for parametrisation of traditional underfrequency load-shedding schemes [J].
Bogovic, Jerneja ;
Rudez, Urban ;
Mihalic, Rafael .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2015, 9 (16) :2625-2632
[6]  
Bonami P., 2007, BONMIN USERS MANUAL, V4, P2008
[7]   Under-Frequency Load Shedding Via Integer Programming [J].
Ceja-Gomez, Frida ;
Qadri, Syed Saadat ;
Galiana, Francisco D. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (03) :1387-1394
[8]   PROBABILISTIC LOAD FLOW CONSIDERING DEPENDENCE BETWEEN INPUT NODAL POWERS [J].
DASILVA, AML ;
ARIENTI, VL ;
ALLAN, RN .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1984, 103 (06) :1524-1530
[9]  
Delfino B, 2001, 2001 POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, P307, DOI 10.1109/PESS.2001.970031
[10]  
ENTSO-E, 2015, NETW COD EM REST