Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan

被引:90
作者
Pei, Jun [1 ,2 ]
Pardalos, Panos M. [2 ]
Liu, Xinbao [1 ,3 ]
Fan, Wenjuan [1 ,4 ]
Yang, Shanlin [1 ,3 ]
机构
[1] Hefei Univ Technol, Sch Management, Hefei, Peoples R China
[2] Univ Florida, Ctr Appl Optimizat, Dept Ind & Syst Engn, Gainesville, FL 32611 USA
[3] Ministiy Educ, Key Lab Proc Optimizat & Intelligent Decis Making, Hefei, Peoples R China
[4] N Carolina State Univ, Dept Comp Sci, Raleigh, NC USA
基金
中国国家自然科学基金;
关键词
Batch scheduling; Supply chain; Deterioration; Transportation; Heuristic; SINGLE; DELIVERY; MACHINES; FLOWSHOP; STAGE;
D O I
10.1016/j.ejor.2014.11.034
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates the coordinated scheduling problem of production and transportation in a two-stage supply chain, where the actual job processing time is a linear function of its starting time. During the production stage the jobs are first processed in serial batches on a bounded serial batching machine at the manufacturer's site. Then, the batches are delivered to a customer by a single vehicle with limited capacity during the transportation stage, and the vehicle can only deliver one batch at one time. The objective of this proposed scheduling problem is to make decisions on job batching and batch sequencing so as to minimize the makespan. Moreover, we consider two different models. With regards to the scheduling model with a buffer for storing the processed batches before transportation, we develop an optimal algorithm to solve it. For the scheduling model without buffer, we present some useful properties and develop a heuristic H for solving it. Then a novel lower bound is derived and two optimal algorithms are designed for solving two special cases. Furthermore, computational experiments with random instances of different sizes are conducted to evaluate the proposed heuristic H, and the results show that our proposed algorithm is superior to other four approaches in the literature. Besides, heuristic H in our experiments can effectively and efficiently solve both small-size and large-size problems in a reasonable time. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:13 / 25
页数:13
相关论文
共 50 条
[41]   Two-agent scheduling with deteriorating jobs on a single parallel-batching machine: refining computational complexity [J].
Mikhail Y. Kovalyov ;
Dmitrij Šešok .
Journal of Scheduling, 2019, 22 :603-606
[42]   A two-stage stochastic supply chain scheduling problem with production in cellular manufacturing environment: A case study [J].
Esmailnezhad, B. ;
Saidi-Mehrabad, M. .
SCIENTIA IRANICA, 2023, 30 (04) :1399-1422
[43]   Application of an effective modified gravitational search algorithm for the coordinated scheduling problem in a two-stage supply chain [J].
Pei, Jun ;
Liu, Xinbao ;
Pardalos, Panos M. ;
Fan, Wenjuan ;
Yang, Shanlin ;
Wang, Ling .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (1-4) :335-348
[44]   LOT SIZING, DELIVERY AND SCHEDULING OF IDENTICAL JOBS IN A SINGLE-STAGE SUPPLY CHAIN [J].
Grunder, Olivier .
INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2010, 6 (08) :3657-3668
[45]   Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan [J].
Chen, Jen-Shiang .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 190 (01) :90-102
[46]   Lookahead batching heuristic for batch scheduling problem of two-stage hybrid flowshop [J].
Chi Y. ;
Liu J. ;
Chen Q. ;
Mao N. .
Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (10) :2559-2570
[47]   Integrating production and transportation scheduling in a two-stage supply chain considering order assignment [J].
Seyed Hessameddin Zegordi ;
Mohammad Ali Beheshti Nia .
The International Journal of Advanced Manufacturing Technology, 2009, 44 :928-939
[48]   Two-machine Shop Scheduling with Two Agents and Linear Deteriorating Jobs [J].
Zhao, Xiaoli ;
Wang, Gongshu .
2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, :1154-1159
[49]   A note on "Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan" [J].
Hadda, Hatem .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 159 :221-222
[50]   A two-stage flexible flow shop problem with unit-execution-time jobs and batching [J].
Gerstl, Enrique ;
Mosheiov, Gur .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 158 :171-178