Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan

被引:87
|
作者
Pei, Jun [1 ,2 ]
Pardalos, Panos M. [2 ]
Liu, Xinbao [1 ,3 ]
Fan, Wenjuan [1 ,4 ]
Yang, Shanlin [1 ,3 ]
机构
[1] Hefei Univ Technol, Sch Management, Hefei, Peoples R China
[2] Univ Florida, Ctr Appl Optimizat, Dept Ind & Syst Engn, Gainesville, FL 32611 USA
[3] Ministiy Educ, Key Lab Proc Optimizat & Intelligent Decis Making, Hefei, Peoples R China
[4] N Carolina State Univ, Dept Comp Sci, Raleigh, NC USA
基金
中国国家自然科学基金;
关键词
Batch scheduling; Supply chain; Deterioration; Transportation; Heuristic; SINGLE; DELIVERY; MACHINES; FLOWSHOP; STAGE;
D O I
10.1016/j.ejor.2014.11.034
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates the coordinated scheduling problem of production and transportation in a two-stage supply chain, where the actual job processing time is a linear function of its starting time. During the production stage the jobs are first processed in serial batches on a bounded serial batching machine at the manufacturer's site. Then, the batches are delivered to a customer by a single vehicle with limited capacity during the transportation stage, and the vehicle can only deliver one batch at one time. The objective of this proposed scheduling problem is to make decisions on job batching and batch sequencing so as to minimize the makespan. Moreover, we consider two different models. With regards to the scheduling model with a buffer for storing the processed batches before transportation, we develop an optimal algorithm to solve it. For the scheduling model without buffer, we present some useful properties and develop a heuristic H for solving it. Then a novel lower bound is derived and two optimal algorithms are designed for solving two special cases. Furthermore, computational experiments with random instances of different sizes are conducted to evaluate the proposed heuristic H, and the results show that our proposed algorithm is superior to other four approaches in the literature. Besides, heuristic H in our experiments can effectively and efficiently solve both small-size and large-size problems in a reasonable time. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:13 / 25
页数:13
相关论文
共 50 条
  • [1] Preemptive scheduling in a two-stage supply chain to minimize the makespan
    Pei, Jun
    Fan, Wenjuan
    Pardalos, Panos M.
    Liu, Xinbao
    Goldengorin, Boris
    Yang, Shanlin
    OPTIMIZATION METHODS & SOFTWARE, 2015, 30 (04): : 727 - 747
  • [2] Scheduling deteriorating jobs to minimize makespan
    Kubiak, W
    van de Velde, S
    NAVAL RESEARCH LOGISTICS, 1998, 45 (05) : 511 - 523
  • [3] Scheduling deteriorating jobs to minimize the makespan on a single machine
    Chin-Chia Wu
    Yau-Ren Shiau
    Ling-Huei Lee
    Wen-Chiung Lee
    The International Journal of Advanced Manufacturing Technology, 2009, 44 : 1230 - 1236
  • [4] Scheduling Deteriorating Jobs with Availability Constraints to Minimize the Makespan
    Zhao, Chuanli
    Tang, Hengyong
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2016, 33 (06)
  • [5] Scheduling deteriorating jobs to minimize the makespan on a single machine
    Wu, Chin-Chia
    Shiau, Yau-Ren
    Lee, Ling-Huei
    Lee, Wen-Chiung
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (11-12): : 1230 - 1236
  • [6] SCHEDULING WITH STEP-DETERIORATING JOBS TO MINIMIZE THE MAKESPAN
    Miao, Cuixia
    Zhang, Yuzhong
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2019, 15 (04) : 1955 - 1964
  • [7] Serial-batching scheduling with two agents to minimize makespan and maximum cost
    He, Cheng
    Xu, Chunqi
    Lin, Hao
    JOURNAL OF SCHEDULING, 2020, 23 (05) : 609 - 617
  • [8] Serial-batching scheduling with two agents to minimize makespan and maximum cost
    Cheng He
    Chunqi Xu
    Hao Lin
    Journal of Scheduling, 2020, 23 : 609 - 617
  • [9] Scheduling Piecewise Linear Deteriorating Jobs to Minimize Makespan in a Two-Machine Flowshop
    Jafari-Nodoushan A.
    Zare H.K.
    Lotfi M.M.
    Tavakkoli-Moghaddam R.
    Operations Research Forum, 2 (4)
  • [10] The Unbounded Parallel-Batching Scheduling Problem with Family Jobs to Minimize Makespan
    Meng, Jintao
    Li, Zhiyong
    SOFTWARE ENGINEERING AND KNOWLEDGE ENGINEERING: THEORY AND PRACTICE, VOL 2, 2012, 115 : 935 - 941