Beam-column joints in continuous RC frames: Comparison between cast-in-situ and precast solutions

被引:101
作者
Breccolotti, Marco [1 ]
Gentile, Santino [2 ]
Tommasini, Mauro [3 ]
Materazzi, Annibale Luigi [1 ]
Bonfigli, Massimo Federico [1 ]
Pasqualini, Bruno [2 ]
Colone, Valerio [2 ]
Gianesini, Marco [2 ]
机构
[1] Dept Civil & Environm Engn, Perugia, Italy
[2] Technip, Rome, Italy
[3] MOST Monitoring & Struct Testing, Rome, Italy
关键词
Earthquake resistant structures; Precast structures; Beam-column joints; Experimental tests; FE modeling; CONCRETE FRAMES; PSEUDODYNAMIC TESTS; LOOP CONNECTIONS; SEISMIC TESTS; BEHAVIOR; SUBASSEMBLAGES; PERFORMANCE; STRENGTH;
D O I
10.1016/j.engstruct.2016.08.018
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The use of precast reinforced concrete elements is rapidly increasing since this technique has several advantages over traditional cast-in-situ structural members such as lower manufacturing time and costs and a better quality control. Nevertheless, cast-in-situ solutions intrinsically allow building moment resisting frames, a behavior that is usually hard to achieve using precast elements. In this paper a technical solution able to offer both high strength and ductility, simplicity of construction of the prefabricated elements and ease of assembly on site is presented. The solution realizes the continuity between beam and column by means of loop splices and cast-in-place concrete with steel fibers to improve the ductility of the concrete struts in the wet joint. The connection has been experimentally tested and compared to an analogous cast-in-situ one. The experimental results confirmed its good structural performances in terms of strength and ductility. Numerical investigations tuned on the basis of the experimental results allowed the improvement of the design to achieve reduced column damages for higher drift values while maintaining practically unchanged structural performances. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:129 / 144
页数:16
相关论文
共 40 条
[1]  
ACI Innovation Task Group, 2001, ACC CRIT MOM FRAM BA
[2]  
ACI Innovation Task Group 1, 2001, T11R01 ACI INN TASK
[3]   Seismic tests of beam-to-column connections in a precast concrete frame [J].
Alcocer, SM ;
Carranza, R ;
Perez-Navarrete, D ;
Martinez, R .
PCI JOURNAL, 2002, 47 (03) :70-+
[4]  
[Anonymous], 1996, 544 ACI
[5]  
[Anonymous], 2008, 318 ACI COMM
[6]   Loop connection with fibre-reinforced precast concrete components in tension [J].
Araujo, Daniel de Lima ;
Curado, Marina Craveiro ;
Rodrigues, Paulo Fernando .
ENGINEERING STRUCTURES, 2014, 72 :140-151
[7]   Pseudodynamic tests on a full-scale 3-storey precast concrete building: Behavior of the mechanical connections and floor diaphragms [J].
Bournas, Dionysios A. ;
Negro, Paolo ;
Molina, Francisco J. .
ENGINEERING STRUCTURES, 2013, 57 :609-627
[8]  
Bruggeling A.S. G., 1991, Prefabrication with Concrete
[9]  
CEN, 2004, 19981 CEN
[10]  
Cheok GS, 1998, ACI STRUCT J, V95, P527