Modelling and Optimizing an Open-Pit Truck Scheduling Problem

被引:30
作者
Chang, Yonggang [1 ,2 ]
Ren, Huizhi [1 ]
Wang, Shijie [1 ]
机构
[1] Shenyang Univ Technol, Sch Mech Engn, Shenyang 110870, Peoples R China
[2] ChinaCoal Pingshuo Grp Co Ltd, Shuozhou 036006, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
D O I
10.1155/2015/745378
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This paper addresses a special truck scheduling problem in the open-pit mine with different transport revenue consideration. A mixed integer programming model is formulated to define the problem clearly and a few valid inequalities are deduced to strengthen the model. Some properties and two upper bounds of the problem are proposed. Based on these inequalities, properties, and upper bounds, a heuristic solution approach with two improvement strategies is proposed to resolve the problem and the numerical experiment demonstrates that the proposed solution approach is effective and efficient.
引用
收藏
页数:8
相关论文
共 19 条
[1]  
Alarie S., 2002, INT J SURFACE MINING, V16, P59, DOI 10.1076/ijsm.16.1.59.3408
[2]   Modelling open pit dynamics using discrete simulation [J].
Askari-Nasab, H. ;
Frimpong, S. ;
Szymanski, J. .
International Journal of Mining, Reclamation and Environment, 2007, 21 (01) :35-49
[3]  
BUSNACH E, 1985, J OPER RES SOC, V36, P285
[4]  
Cai WL, 2001, COMPUTER APPLICATIONS IN THE MINERALS INDUSTRIES, P217
[5]  
Fang P., 2003, J ENG MATH, V20, P91
[6]  
Frimpong S., 2002, INT J SURFACE MINING, V16, P134
[7]  
Jalali S. E., 2006, CANADIAN I MINING MA, V1, P90
[8]  
Kappas George., 1991, INT J SURFACE MINING, V5, P45, DOI DOI 10.1080/09208119108944286
[9]  
Kawahata K., 2006, Ph.D. Thesis
[10]  
KLINGMAN D, 1988, J OPER RES SOC, V39, P805, DOI 10.1057/palgrave.jors.0390902