Economic perspectives of Power-to-Gas technologies in bio-methane production

被引:28
作者
Saric, Marija [1 ]
Dijkstra, Jan Wilco [1 ]
Haije, Wim G. [1 ,2 ]
机构
[1] Energy Res Ctr Netherlands, ECN, POB 1, NL-1755 ZG Petten, Netherlands
[2] Delft Univ Technol, Proc & Energy Lab 3ME, Bldg 34B,Leeghwaterstr 39, NL-2628 CB Delft, Netherlands
关键词
Power-to-Gas; Bio-SNG; Producer gas; Biomass gasification; Techno-economic evaluation; HYDROGEN;
D O I
10.1016/j.jcou.2017.05.007
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
A study on integration of Power-to-Gas technology with bio-methane production from bio-syngas produced by biomass gasification shows that a significant amount of excess electricity can be accommodated in bio-SNG production. By adding hydrogen produced from intermittent renewable sources to a CO2 methanation section, production capacity of methane can be doubled. The business case for Power-to-Gas for bio-methane has been evaluated using three future cumulative electricity prices curves. Results show that a positive business case exists only for price curves based on large amounts of intermittent electricity installed. The room for investment for the electrolyser will mainly and highly depend on future commodity prices and price curves, and will benefit significantly from a decrease in the cost price of the electrolyser. The projected room for investment available for a PEM electrolyser is lower than for a Solid Oxide Electrolyzer (SOE), because of its lower efficiency and resulting higher operating costs. In the case of large capacity of intermittent electricity, the projected room for investment of an SOE electrolyser is 650 sic/kW and for a PEM electrolyser 350 sic/kW, which corresponds to the projections of future electrolyser costs.
引用
收藏
页码:81 / 90
页数:10
相关论文
共 36 条
[1]  
[Anonymous], 2014, EC LARGE SCALE BIOMA
[2]  
[Anonymous], 2013, P IPCS13 INT C POLYG
[3]  
[Anonymous], 2010, DEV MILENA GASIFICAT
[4]  
[Anonymous], 2014, EXPLORING ROLE POWER
[5]  
[Anonymous], 2008, FP7 ENERGY 2007 5 1
[6]  
[Anonymous], 2014, EN PRIC COSTS EUR
[7]  
[Anonymous], 2014, ENERGIEPRIJZEN ENKEL
[8]  
[Anonymous], 2009, EUR ONSH OFFSH WIND
[9]  
Bertuccioli L, 2014, DEV WATER ELECTROLYS, V83
[10]  
Davis C, 1981, METHANATION PLANT DE