共 11 条
[1]
GO P, 1997, COMPU IND ENG, V32, P477
[4]
NAKASHIMA T, 2006, JSME INT J C-DYN CON, P1
[5]
PROTH M, 1996, PETRI NET TOOL DESIG
[6]
Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey
[J].
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS,
2006, 36 (04)
:563-577
[7]
SMITH RG, 1980, IEEE T COMPUT, V29, P1104, DOI 10.1109/TC.1980.1675516
[8]
SUGIMURA N, 2005, CIRP J MANUFACTURING, V6, P34
[9]
SUGIMURA N, 2004, CIRP J MANUF SCI TEC, V33, P467