Reliable generation expansion planning in pool market considering power system security

被引:24
作者
Tafreshi, S. M. Moghaddas [2 ]
Lahiji, A. Saliminia [2 ]
Aghaei, J. [1 ]
Rabiee, A. [3 ]
机构
[1] Shiraz Univ Technol, Dept Elect & Elect Engn, Shiraz, Iran
[2] KN Toosi Univ Technol, Fac Elect & Comp Engn, Tehran, Iran
[3] Islamic Azad Univ, Dept Elect Engn, Damavand Branch, Tehran, Iran
关键词
Generation expansion planning; Dynamic programming; Pool market; Modified game theory; Reliability;
D O I
10.1016/j.enconman.2011.10.008
中图分类号
O414.1 [热力学];
学科分类号
摘要
One of the main challenges of restructured power systems is to maintain sufficient installed generation capacity to meet system demand in different load points of transmission network both for present and future time. This paper presents a comprehensive Generation Expansion Planning (GEP) scheme in pool market, ensuring secure operation of power system in different load points. The proposed algorithm is divided into two programming levels: master and slave. In the master level, a Modified Game Theory (MGT) is proposed to evaluate the contrast of generation companies (GENCOs) by Independent System Operator (ISO). Besides that, the reliability level of all load points is optimized based on the availability of the composite power system, i.e. generation and transmission level. In the slave level, a Dynamic Programming (DP) method is used to find the best solution of each GENCO for decision making of investment. The validity of the proposed GEP is studied on Roy Billinton Test System (RBTS). (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:162 / 168
页数:7
相关论文
共 16 条
[1]  
[Anonymous], 1897, Researches into the Mathematical Principles of the Theory of Wealth
[2]   A RELIABILITY TEST SYSTEM FOR EDUCATIONAL PURPOSES - BASIC DATA [J].
BILLINTON, R ;
KUMAR, S ;
CHOWDHURY, N ;
CHU, K ;
DEBNATH, K ;
GOEL, L ;
KHAN, E ;
KOS, P ;
NOURBAKHSH, G ;
OTENGADJEI, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (03) :1238-1244
[3]  
Billinton R., 1992, RELIABILITY EVALUATI, P260
[4]  
Choi Jaeseok, 2005, IEEE P INT C POW SYS
[5]   A game-theoretic model for generation expansion planning: Problem formulation and numerical comparisons [J].
Chuang, AS ;
Wu, F ;
Varaiya, P .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) :885-891
[6]   Reliability evaluation of deregulated electric power systems for planning applications [J].
Ehsani, A. ;
Ranjbar, A. M. ;
Jafari, A. ;
Fotuhi-Firuzabad, M. .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2008, 93 (10) :1473-1484
[7]  
Hu Z, 2002, IEEE C POW SYST TECH, V2
[8]   Application and comparison of metaheuristic techniques to generation expansion planning in the partially deregulated environment [J].
Kannan, S. ;
Slochanal, S. Mary Raja ;
Baskar, S. ;
Murugan, P. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2007, 1 (01) :111-118
[9]  
Kim Jim Ho, 2005, IEEE P INT C POW SYS
[10]   Probabilistic criteria for power system expansion planning [J].
Manso, LAF ;
da Silva, AML .
ELECTRIC POWER SYSTEMS RESEARCH, 2004, 69 (01) :51-58