Predictive quality assurance of a linear accelerator based on the machine performance check application using statistical process control and ARIMA forecast modeling

被引:16
|
作者
Puyati, Wayo [1 ,2 ]
Khawne, Amnach [1 ]
Barnes, Michael [3 ,4 ]
Zwan, Benjamin [4 ,5 ]
Greer, Peter [3 ,4 ]
Fuangrod, Todsaporn [6 ]
机构
[1] King Mongkuts Inst Technol Ladkrabang, Fac Engn, Dept Comp Engn, Bangkok 10520, Thailand
[2] Ubon Ratchathani Univ, Fac Sci, Dept Math Stat & Comp, Ubon Ratchathani 34190, Thailand
[3] Calvary Mater Hosp Newcastle, Dept Radiat Oncol, Newcastle, NSW 2298, Australia
[4] Univ Newcastle, Sch Math & Phys Sci, Newcastle, NSW 2308, Australia
[5] Gosford Hosp, Cent Coast Canc Ctr, Gosford, NSW 2250, Australia
[6] Chulabhorn Royal Acad, HRH Princess Chulabhorn Coll Med Sci, Fac Med & Publ Hlth, Bangkok 10210, Thailand
来源
JOURNAL OF APPLIED CLINICAL MEDICAL PHYSICS | 2020年 / 21卷 / 08期
关键词
autoregressive integrated moving average forecast modeling; machine performance check; predictive quality assurance; statistical process control; VERIFICATION; STABILITY; SYMMETRY;
D O I
10.1002/acm2.12917
中图分类号
R8 [特种医学]; R445 [影像诊断学];
学科分类号
1002 ; 100207 ; 1009 ;
摘要
Purpose A predictive linac quality assurance system based on the output of the Machine Performance Check (MPC) application was developed using statistical process control and autoregressive integrated moving average forecast modeling. The aim of this study is to demonstrate the feasibility of predictive quality assurance based on MPC tests that allow proactive preventative maintenance procedures to be carried out to better ensure optimal linac performance and minimize downtime. Method and Materials Daily MPC data were acquired for a total of 490 measurements. The initial 85% of data were used in prediction model learning with the autoregressive integrated moving average technique and in calculating upper and lower control limits for statistical process control analysis. The remaining 15% of data were used in testing the accuracy of the predictions of the proposed system. Two types of prediction were studied, namely, one-step-ahead values for predicting the next day's quality assurance results and six-step-ahead values for predicting up to a week ahead. Results that fall within the upper and lower control limits indicate a normal stage of machine performance, while the tolerance, determined from AAPM TG-142, is the clinically required performance. The gap between the control limits and the clinical tolerances (as the warning stage) provides a window of opportunity for rectifying linac performance issues before they become clinically significant. The accuracy of the predictive model was tested using the root-mean-square error, absolute error, and average accuracy rate for all MPC test parameters. Results The accuracy of the predictive model is considered high (average root-mean-square error and absolute error for all parameters of less than 0.05). The average accuracy rate for indicating the normal/warning stages was higher than 85.00%. Conclusion Predictive quality assurance with the MPC will allow preventative maintenance, which could lead to improved linac performance and a reduction in unscheduled linac downtime.
引用
收藏
页码:73 / 82
页数:10
相关论文
共 14 条
  • [1] Predictive quality assurance for linear accelerator target failure using statistical process control
    Li, Jingdong
    Wang, Dongxu
    Chan, Maria
    BIOMEDICAL PHYSICS & ENGINEERING EXPRESS, 2023, 9 (05)
  • [2] Predictive quality assurance for ring gantry linear accelerator using deep learning and statistical process control
    Petchuchart, Chunlajit
    Kummanee, Patiparn
    Chancharoen, Wares
    Khamfongkhruea, Chirasak
    Fuangrod, Todsaporn
    2023 18TH INTERNATIONAL JOINT SYMPOSIUM ON ARTIFICIAL INTELLIGENCE AND NATURAL LANGUAGE PROCESSING, ISAI-NLP, 2023,
  • [3] Radiotherapy Quality Assurance Using Statistical Process Control
    Binny, Diana
    Lancaster, Craig M.
    Kairn, Tanya
    Trapp, Jamie V.
    Crowe, Scott B.
    WORLD CONGRESS ON MEDICAL PHYSICS AND BIOMEDICAL ENGINEERING 2018, VOL 3, 2019, 68 (03): : 437 - 442
  • [4] Moving towards process-based radiotherapy quality assurance using statistical process control
    Raveendran, Vysakh
    Raman, R. Ganapathi
    Anjana, P. T.
    Bhasi, Saju
    Ranjith, C. P.
    Kinhikar, Rajesh Ashok
    PHYSICA MEDICA-EUROPEAN JOURNAL OF MEDICAL PHYSICS, 2023, 112
  • [6] Feasibility study of using statistical process control to customized quality assurance in proton therapy
    Rah, Jeong-Eun
    Shin, Dongho
    Oh, Do Hoon
    Kim, Tae Hyun
    Kim, Gwe-Ya
    MEDICAL PHYSICS, 2014, 41 (09)
  • [7] Initial investigation using statistical process control for quality control of accelerator beam steering
    Charles M Able
    Carnell J Hampton
    Alan H Baydush
    Michael T Munley
    Radiation Oncology, 6
  • [8] Initial investigation using statistical process control for quality control of accelerator beam steering
    Able, Charles M.
    Hampton, Carnell J.
    Baydush, Alan H.
    Munley, Michael T.
    RADIATION ONCOLOGY, 2011, 6
  • [9] Quality assurance system using statistical process control: An implementation for image cytometry
    Chiu, D
    Guillaud, M
    Cox, D
    Follen, M
    MacAulay, C
    CELLULAR ONCOLOGY, 2004, 26 (03) : 101 - 117
  • [10] Feasibility study of using statistical process control to optimize quality assurance in radiotherapy
    Gerard, Karine
    Grandhaye, Jean-Pierre
    Marchesi, Vincent
    Aletti, Pierre
    Husson, Francois
    Noel, Alain
    Kafrouni, Hanna
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2009, 15 (04) : 331 - +