Enhanced phosphorus removal in intermittently aerated constructed wetlands filled with various construction wastes

被引:56
作者
Shi, Xia [1 ]
Fan, Jinlin [2 ]
Zhang, Jian [1 ]
Shen, Youhao [1 ]
机构
[1] Shandong Univ, Sch Environm Sci & Engn, Shandong Key Lab Water Pollut Control & Resource, Jinan 250100, Shandong, Peoples R China
[2] Shandong Univ, Natl Engn Lab Coal Fired Pollutants Emiss Reduct, Jinan 250061, Shandong, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Constructed wetlands; Phosphorus removal; Intermittent aeration; Construction waste; Microbial mechanism; Phosphorus mass balance; STEEL SLAG FILTERS; NITROGEN REMOVAL; NUTRIENT REMOVAL; MASS-BALANCE; WATER; SYSTEM; SLUDGE; PERFORMANCE; COMPETITION; MECHANISMS;
D O I
10.1007/s11356-017-9870-z
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Phosphorus (P) loss by various pathways in constructed wetlands (CWs) is often variable. The effects of intermittent aeration and different construction waste substrates (gravel, red brick, fly-ash brick) on P processing using six batch-operated vertical flow constructed wetlands (VFCWs) were studied for decentralized domestic wastewater treatment. Average removal of total phosphorus (TP) in three aerated CWs was markedly higher (21.06, 24.83, and 27.02 mg m(-2) day(-1), respectively) than non-aerated CWs (10.64, 18.16, and 25.09 mg m(-2) day(-1), respectively). Fly-ash brick offered superior TP removal efficiency in both aerated and non-aerated batch-operated VFCWs, suggesting its promising application for P removal in CWs. Aeration greatly promoted plant growth and thusly increased plant uptake of P by 0.57-1.45 times. Substance storage was still the main P sink accounting for 23.92-59.47% of TP removal. Other process including microbial uptake was revealed to be a very important P removal pathway (accounting for 14.86-34.84%). The contribution of microbial uptake was also indicated by microbial analysis. Long-term results suggested that the contribution of microbial P uptake could be always ignored and underestimated in most CWs. A combination of intermittent aeration and suitable substrates is effective to intensify P transformation in CWs.
引用
收藏
页码:22524 / 22534
页数:11
相关论文
共 50 条
  • [1] Enhanced phosphorus removal in intermittently aerated constructed wetlands filled with various construction wastes
    Xia Shi
    Jinlin Fan
    Jian Zhang
    Youhao Shen
    Environmental Science and Pollution Research, 2017, 24 : 22524 - 22534
  • [2] Intensified nitrogen transformation in intermittently aerated constructed wetlands: Removal pathways and microbial response mechanism
    Liu, Fei-fei
    Fan, Jinlin
    Du, Jinhui
    Shi, Xia
    Zhang, Jian
    Shen, Youhao
    SCIENCE OF THE TOTAL ENVIRONMENT, 2019, 650 : 2880 - 2887
  • [3] Enhanced long-term organics and nitrogen removal and associated microbial community in intermittently aerated subsurface flow constructed wetlands
    Fan, Jinlin
    Zhang, Jian
    Guo, Wenshan
    Liang, Shuang
    Wu, Haiming
    BIORESOURCE TECHNOLOGY, 2016, 214 : 871 - 875
  • [4] Optimization of organics and nitrogen removal in intermittently aerated vertical flow constructed wetlands: Effects of aeration time and aeration rate
    Wu, Haiming
    Fan, Jinlin
    Zhang, Jian
    Ngo, Huu Hao
    Guo, Wenshan
    Hu, Zhen
    Lv, Jialong
    INTERNATIONAL BIODETERIORATION & BIODEGRADATION, 2016, 113 : 139 - 145
  • [5] Nitrogen removal in intermittently aerated vertical flow constructed wetlands: Impact of influent COD/N ratios
    Fan, Jinlin
    Wang, Wengang
    Zhang, Bo
    Guo, Yeye
    Ngo, Huu Hao
    Guo, Wenshan
    Zhang, Jian
    Wu, Haiming
    BIORESOURCE TECHNOLOGY, 2013, 143 : 461 - 466
  • [6] Enhanced optimal removal of nitrogen and organics from intermittently aerated vertical flow constructed wetlands: Relative COD/N ratios and microbial responses
    Lai, Xiaoshuang
    Zhao, Yuqiang
    Pan, Fuxia
    Yang, Baoshan
    Wang, Hui
    Wang, Shuzhi
    He, Fei
    CHEMOSPHERE, 2020, 244
  • [7] Simultaneous removal of nitrogen and dimethyl phthalate from low-carbon wastewaters by using intermittently-aerated constructed wetlands
    Zhao, Xin
    Wang, RuiGang
    Dong, Lu
    Li, Wen
    Li, Ming
    Wu, Haiming
    JOURNAL OF HAZARDOUS MATERIALS, 2021, 404
  • [8] Recent advances in the enhanced nitrogen removal by oxygen-increasing technology in constructed wetlands
    Lu, Jiaxing
    Guo, Zizhang
    Kang, Yan
    Fan, Jinlin
    Zhang, Jian
    ECOTOXICOLOGY AND ENVIRONMENTAL SAFETY, 2020, 205
  • [9] Vegetation contribution on phosphorus removal in constructed wetlands
    Maucieri, Carmelo
    Salvato, Michela
    Borin, Maurizio
    ECOLOGICAL ENGINEERING, 2020, 152
  • [10] Enhanced nitrogen removal in constructed wetlands with a multistage-A/O process
    Chen, Jieyu
    Wang, Jie
    Wang, Xiaoning
    Lv, Yabing
    Chen, Ruiya
    Xu, Juchen
    Li, Dapeng
    Hou, Jie
    He, Xugang
    ENVIRONMENTAL SCIENCE-WATER RESEARCH & TECHNOLOGY, 2023, 9 (10) : 2472 - 2486