A Dynamic Just-in-Time Component Delivery Framework for Off-Site Construction

被引:15
|
作者
Si, Tongguang [1 ,2 ]
Li, Hong Xian [2 ]
Lei, Zhen [3 ]
Liu, Hexu [4 ]
Han, SangHyeok [5 ]
机构
[1] Shandong Jianzhu Univ, Sch Management Engn, 1000 Fengming Rd, Jinan 250101, Peoples R China
[2] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic 3220, Australia
[3] Univ New Brunswick, Dept Civil Engn, Fredericton, NB E3B 5A3, Canada
[4] Western Michigan Univ, Dept Civil & Construct Engn, Kalamazoo, MI 49008 USA
[5] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ H3G 1M8, Canada
关键词
CONCRETE PRODUCTION; OPTIMIZATION; MANAGEMENT; PERFORMANCE; SIMULATION; OFFSITE; SYSTEM; TRANSPORTATION; IDENTIFICATION; COORDINATION;
D O I
10.1155/2021/9953732
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Off-site construction entails various advantages compared with the traditional construction method; however, the fragmentation of the prefabrication and assembly results in a complex supply chain. Both general contractors and factories often encounter production deviation, making the original component delivery plan nonoptimal. Traditionally, both parties tend to rely on internal resources or third-party resources to manage schedule changes, paying little attention to the optimisation of the component delivery process. The static compensation mechanisms reported in existing literature require factories to manage demand fluctuations but fail to encourage general contractors to control schedule deviations. Therefore, a dynamic compensation mechanism is proposed to achieve just-in-time component delivery, with which a factory shares possible changes for each component's delivery date to its clients on an inverse Kanban system. First, unfavourable changes for the factory schedule are allocated with surcharges, and the general contractor should compensate the factory if it accepts the date changes; secondly, schedule changes that are beneficial for the factory are assigned as incentives, and the general contractor receives the factory's incentive upon agreeing to the changes. Based on these two scenarios, genetic algorithm-based optimisation models are developed to achieve optimal delivery planning solutions. General contractors can obtain an optimal component delivery date to reduce the additional cost when they have changed the assembly schedule. General contractors can also optimise their component delivery schedule to trade their duration flexibility for incentives offered by factories. The models can help both parties to reduce component delivery waste when either side has the motivation to change the original component delivery schedules.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] BIM-Based Management System for Off-Site Construction Projects
    Jang, YeEun
    Son, JeongWook
    Yi, June-Seong
    APPLIED SCIENCES-BASEL, 2022, 12 (19):
  • [22] Linking employee empowerment with productivity in off-site construction
    Alazzaz, Faisal
    Whyte, Andrew
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (01) : 21 - 37
  • [23] Proposing a Lean-Optimized Scheduling Model of Mixed-Flow Prefabricated Component Production in Off-Site Construction
    Zheng, Ruiyan
    Li, Zhongfu
    Li, Long
    Dou, Yudan
    Yuan, Mengqi
    Yin, Xianfei
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (08)
  • [24] Current Research and Future Directions for Off-Site Construction through LangChain with a Large Language Model
    Jeong, Jaemin
    Gil, Daeyoung
    Kim, Daeho
    Jeong, Jaewook
    BUILDINGS, 2024, 14 (08)
  • [25] A holistic review of off-site construction literature published between 2008 and 2018
    Jin, Ruoyu
    Gao, Shang
    Cheshmehzangi, Ali
    Aboagye-Nimo, Emmanuel
    JOURNAL OF CLEANER PRODUCTION, 2018, 202 : 1202 - 1219
  • [26] Simulation of a Construction Project: Assessing Impact of Just-in-Time and Lean Principles
    Bamana, Flora
    Lehoux, Nadia
    Cloutier, Caroline
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (05)
  • [27] Operations planning and scheduling in off-site construction supply chain management: Scope definition and future directions
    Zaalouk, Ahmed
    Moon, Sungkon
    Han, SangHyeok
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [28] Off-site construction with 3D concrete printing
    Ter Haar, Bjorn
    Kruger, Jacques
    van Zijl, Gideon
    AUTOMATION IN CONSTRUCTION, 2023, 152
  • [29] Supply chain coordination with uncertain just-in-time delivery
    Zimmer, K
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 77 (01) : 1 - 15
  • [30] Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction
    Kong, Liulin
    Li, Heng
    Luo, Hanbin
    Ding, Lieyun
    Zhang, Xiaoling
    JOURNAL OF CLEANER PRODUCTION, 2018, 193 : 684 - 701