Uncertain resource leveling problem

被引:10
|
作者
Ke, Hua [1 ]
Zhao, Chenkai [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scheduling; uncertainty theory; resource leveling; estimation of distribution algorithm; PROJECT SCHEDULING PROBLEM; DISTRIBUTION ALGORITHM; GENETIC ALGORITHM; PROGRAMMING-MODEL; OPTIMIZATION;
D O I
10.3233/JIFS-17493
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Resource leveling problem is to make a schedule for the minimization of resource fluctuation subject to precedence constraint and other specific constraints. When indeterminacies come into play, the leveled baseline schedule obtained by solving deterministic resource leveling problem can hardly be executed as planned and this schedule may even become infeasible. In this paper, on the basis of uncertainty theory, we consider an uncertain resource leveling problem in which activity durations are estimated by experts. In order to deal with these estimations, three uncertainty-theory-based project scheduling models are proposed and we utilize revised estimation of distribution algorithms to search quasi-optimal schedules. Numerical experiments are also provided to illustrate the effectiveness of the algorithms.
引用
收藏
页码:2351 / 2361
页数:11
相关论文
共 50 条
  • [31] Resource planning and allocation problem under uncertain environment
    Juliang Zhang
    Journal of Systems Science and Complexity, 2015, 28 : 1115 - 1127
  • [32] Resource Planning and Allocation Problem Under Uncertain Environment
    Zhang Juliang
    JOURNAL OF SYSTEMS SCIENCE & COMPLEXITY, 2015, 28 (05) : 1115 - 1127
  • [33] Resource Planning and Allocation Problem Under Uncertain Environment
    ZHANG Juliang
    JournalofSystemsScience&Complexity, 2015, 28 (05) : 1115 - 1127
  • [34] Multiobjective model for solving resource-leveling problem with discounted cash flows
    Abadi, Niloofar Nikoofal Sahl
    Bagheri, Mohsen
    Assadi, Mohammad
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2018, 25 (06) : 2009 - 2030
  • [35] Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling
    Selvam, Gopinath
    Tadepalli, T. Ch. Madhavi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (04) : 659 - 668
  • [36] An Ant Colony-Based Optimization Model for Resource-Leveling Problem
    Duraiswamy, Asha
    Selvam, Gopinath
    ADVANCES IN CONSTRUCTION MANAGEMENT, ACMM 2021, 2022, 191 : 333 - 342
  • [37] Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    Beniloch-Marco, J.
    AUTOMATION IN CONSTRUCTION, 2017, 77 : 82 - 92
  • [38] PREEMPTIVE RESOURCE LEVELING IN PROJECTS
    Li, Hongbo
    Hu, Ziyi
    Zhu, Hanyu
    Liu, Yinbin
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2021, 55 (04): : 51 - 68
  • [39] Resource leveling in a machine environment
    Marton Drotos
    Kis, Tamas
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (01) : 12 - 21
  • [40] RESOURCE LEVELING IN CONSTRUCTION BY OPTIMIZATION
    EASA, SM
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (02): : 302 - 316