Uncertain resource leveling problem

被引:10
|
作者
Ke, Hua [1 ]
Zhao, Chenkai [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scheduling; uncertainty theory; resource leveling; estimation of distribution algorithm; PROJECT SCHEDULING PROBLEM; DISTRIBUTION ALGORITHM; GENETIC ALGORITHM; PROGRAMMING-MODEL; OPTIMIZATION;
D O I
10.3233/JIFS-17493
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Resource leveling problem is to make a schedule for the minimization of resource fluctuation subject to precedence constraint and other specific constraints. When indeterminacies come into play, the leveled baseline schedule obtained by solving deterministic resource leveling problem can hardly be executed as planned and this schedule may even become infeasible. In this paper, on the basis of uncertainty theory, we consider an uncertain resource leveling problem in which activity durations are estimated by experts. In order to deal with these estimations, three uncertainty-theory-based project scheduling models are proposed and we utilize revised estimation of distribution algorithms to search quasi-optimal schedules. Numerical experiments are also provided to illustrate the effectiveness of the algorithms.
引用
收藏
页码:2351 / 2361
页数:11
相关论文
共 50 条
  • [1] Application of CBO and CSS for Resource Allocation and Resource Leveling Problem
    M. Khanzadi
    A. Kaveh
    M. Alipour
    H. Karimi Aghmiuni
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2016, 40 : 1 - 10
  • [2] RESEARCH ON RESOURCE LEVELING PROBLEM UNDER RESOURCE CONSTRAINED CONDITION
    Wang, Qiang
    Qi, Jian-Xun
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 901 - 906
  • [3] Application of CBO and CSS for Resource Allocation and Resource Leveling Problem
    Khanzadi, M.
    Kaveh, A.
    Alipour, M.
    Aghmiuni, H. Karimi
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2016, 40 (01) : 1 - 10
  • [4] A Memetic Algorithm for the Solution of the Resource Leveling Problem
    Iranagh, Mehdi
    Sonmez, Rifat
    Atan, Tankut
    Uysal, Furkan
    Bettemir, Onder Halis
    BUILDINGS, 2023, 13 (11)
  • [5] A hybrid genetic algorithm for resource leveling problem
    Zhao, Hanping
    Liu, Liming
    Jiang, Jiadong
    Li, Ke
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON RISK ANALYSIS AND CRISIS RESPONSE, 2007, 2 : 786 - 790
  • [6] A genetic algorithm for the robust resource leveling problem
    Hongbo Li
    Erik Demeulemeester
    Journal of Scheduling, 2016, 19 : 43 - 60
  • [7] Scheduling Policies for the Stochastic Resource Leveling Problem
    Li, Hongbo
    Xu, Zhe
    Demeulemeester, Erik
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (02)
  • [8] A genetic algorithm for the robust resource leveling problem
    Li, Hongbo
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2016, 19 (01) : 43 - 60
  • [9] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [10] Improved particle swarm optimization for resource leveling problem
    Qi, Jian-Xun
    Wang, Qiang
    Guo, Xin-Zhi
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 896 - 901