Realtime scheduling heuristics for just-in-time production in large-scale flexible job shops

被引:5
作者
Weng, Wei [1 ]
Chen, Junru [2 ]
Zheng, Meimei [3 ]
Fujimura, Shigeru [2 ]
机构
[1] Kanazawa Univ, Inst Liberal Arts & Sci, Kanazawa, Ishikawa 9201192, Japan
[2] Waseda Univ, Grad Sch Informat Prod & Syst, Wakamatsu Ku, 2-7 Hibikino, Kitakyushu, Fukuoka 8080135, Japan
[3] Shanghai Jiao Tong Univ, Sch Mech Engn, 800 Dongchuan Rd, Shanghai 200240, Peoples R China
基金
中国国家自然科学基金;
关键词
Just-in-time production; Flexible job shop; Realtime scheduling; Intelligent production; Due date setting; Dispatching rule; Industrial case study; DUE-DATE ASSIGNMENT; DISPATCHING RULES; FLOW-TIME; ALGORITHM; OPTIMIZATION; MODELS;
D O I
10.1016/j.jmsy.2022.01.006
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study aims to enable jobs to go smoothly between shops on a production line by completing jobs in the upstream shop just in time (JIT) for the downstream shop. We propose solutions to a factory that is seeking ways for an upstream shop to complete every job at the precise time such that the downstream shop can process the job. We model the upstream shop as a flexible job shop and propose four methods that form a realtime scheduling and control system for JIT production. We first propose a method to set for each job a due date by which the job should be completed in the upstream shop. The due dates are set in such a manner that jobs would be completed JIT for the downstream shop, if they are completed JIT for their due dates. We then propose a method to estimate the minimum number of workers needed in the upstream shop for completing the jobs by their due dates. We further propose two methods that work dynamically to complete each job neither too early nor too late for its due date. One is a dispatching rule that dynamically sequences jobs in process according to urgency degree. The other is a job-selecting heuristic that dynamically assigns workers to jobs such that jobs not nearing completion will be given priority in processing. Simulations by using data from the factory show that the methods can achieve in real time (i.e. within 0.00 seconds) JIT production for a flexible job shop problem involving hundreds of operations. More extensive simulations by using a large number of randomly generated problem instances show that solutions obtained in real time by the proposed methods greatly outperform those obtained in much longer time by metaheuristics designed for solving similar problems, and that each proposed method outperforms its rivals in the literature. The findings imply that integrating fast and high-performing heuristics and rules can be a solution to solve large-scale scheduling problems in real time.
引用
收藏
页码:64 / 77
页数:14
相关论文
共 50 条
  • [1] Study and Application of Scheduling Method for Just-in-time Production in Flexible Job Shops
    Weng, Wei
    Fujimura, Shigeru
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 318 - 322
  • [2] Integrated process planning and scheduling for large-scale flexible job shops using metaheuristics
    Sobeyko, Oleh
    Moench, Lars
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (02) : 392 - 409
  • [3] LOAD-ORIENTED MANUFACTURING CONTROL JUST-IN-TIME PRODUCTION FOR JOB SHOPS
    BECHTE, W
    PRODUCTION PLANNING & CONTROL, 1994, 5 (03) : 292 - 307
  • [4] An integrated search heuristic for large-scale flexible job shop scheduling problems
    Yuan, Yuan
    Xu, Hua
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (12) : 2864 - 2877
  • [5] A Large-Scale Empirical Study of Just-in-Time Quality Assurance
    Kamei, Yasutaka
    Shihab, Emad
    Adams, Bram
    Hassan, Ahmed E.
    Mockus, Audris
    Sinha, Anand
    Ubayashi, Naoyasu
    IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 2013, 39 (06) : 757 - 773
  • [6] Solving the flexible job-shop just-in-time scheduling problem with quadratic earliness and tardiness costs
    Rey, Gabriel Zambrano
    Bekrar, Abdelghani
    Trentesaux, Damien
    Zhou, Bing-Hai
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12) : 1871 - 1891
  • [7] Autonomous decentralized scheduling system for just-in-time production
    Nishi, T
    Sakata, A
    Hasebe, S
    Hashimoto, I
    COMPUTERS & CHEMICAL ENGINEERING, 2000, 24 (2-7) : 345 - 351
  • [8] Production scheduling and lot streaming at flexible job-shops environments using constraint programming
    Novas, Juan M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 136 : 252 - 264
  • [9] Improved heuristics algorithms for re-scheduling flexible job shops in the era of Zero Defect manufacturing
    Psarommatis, Foivos
    Vuichard, Martin
    Kiritsis, Dimitris
    30TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2021), 2020, 51 : 1485 - 1490
  • [10] Genetic Programming With Lexicase Selection for Large-Scale Dynamic Flexible Job Shop Scheduling
    Xu, Meng
    Mei, Yi
    Zhang, Fangfang
    Zhang, Mengjie
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2024, 28 (05) : 1235 - 1249