GENCO's risk-based maintenance outage scheduling

被引:65
作者
Wu, Lei [1 ]
Shahidehpour, Mohammad [1 ]
Li, Tao [1 ]
机构
[1] IIT, Dept Elect & Comp Engn, Chicago, IL 60616 USA
基金
美国国家科学基金会;
关键词
Monte Carlo simulation; optimal generation; maintenance outage scheduling; price-based unit commitment; risk-based GENCOs; stochastic mixed integer programming;
D O I
10.1109/TPWRS.2007.913295
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a stochastic model for the optimal risk-based generation maintenance outage scheduling based on hourly price-based unit commitment in a generation company (GENCO). Such maintenance outage schedules will be submitted by GENCOs to the ISO for approval before implementation. The objective of a GENCO is to consider financial risks when scheduling its midterm maintenance outages. The GENCO also coordinates its proposed outage scheduling with short-term unit commitment for maximizing payoffs. The proposed model is a stochastic mixed integer linear program in which random hourly prices of energy, ancillary services, and fuel are modeled as scenarios in the Monte Carlo method. Financial risks associated with price uncertainty are considered by applying expected downside risks which are incorporated explicitly as constraints. This paper shows that GENCOs could decrease financial risks by adjusting expected payoffs. Illustrative examples show the calculation of GENCO's midterm generation maintenance schedule, risk level, hourly unit commitment, and hourly dispatch for bidding into energy and ancillary services markets.
引用
收藏
页码:127 / 136
页数:10
相关论文
共 25 条
[1]  
AHMED S, MEANRISK OBJECTIVES
[2]   Composite system maintenance coordination in a deregulated environment [J].
Billinton, R ;
Mo, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (01) :485-492
[3]   Short-term generating unit maintenance scheduling in a deregulated power system using a probabilistic approach [J].
Billinton, R ;
Abdulwhab, A .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2003, 150 (04) :463-468
[4]  
Birge J.R., 1997, INTRO STOCHASTIC PRO
[5]   Generation maintenance scheduling in restructured power systems [J].
Conejo, AJ ;
García-Bertrand, R ;
Díaz-Salazar, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :984-992
[6]   ARIMA models to predict next-day electricity prices [J].
Contreras, J ;
Espínola, R ;
Nogales, FJ ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (03) :1014-1020
[7]   Risk assessment in energy trading [J].
Dahgren, R ;
Liu, CC ;
Lawarrée, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (02) :503-511
[8]   Scenario reduction in stochastic programming -: An approach using probability metrics [J].
Dupacová, J ;
Gröwe-Kuska, N ;
Römisch, W .
MATHEMATICAL PROGRAMMING, 2003, 95 (03) :493-511
[9]   A SCENARIO APPROACH TO CAPACITY PLANNING [J].
EPPEN, GD ;
MARTIN, RK ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1989, 37 (04) :517-527
[10]   Long-term security-constrained unit commitment: Hybrid Dantwig-Wolfe decomposition and subgradient approach [J].
Fu, Y ;
Shahidehpour, M ;
Li, ZY .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (04) :2093-2106