Heuristics for a flowshop scheduling problem with stepwise job objective function

被引:27
|
作者
Pessoa, Luciana S. [1 ]
Andrade, Carlos E. [2 ]
机构
[1] Pontificia Univ Catolica Rio de Janeiro, Dept Ind Engn, Rua Marques de Silo Vicente 225, BR-22453900 Rio de Janeiro, RJ, Brazil
[2] AT&T Labs Res, 200 South Laurel Ave, Middletown, NJ 07748 USA
关键词
Flowshop scheduling; Heuristics; Metaheuristics; HYBRID GENETIC ALGORITHM; PERMUTATION FLOWSHOP; MAKESPAN; MACHINE; FLOWTIME; TARDINESS;
D O I
10.1016/j.ejor.2017.10.045
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this work, we introduce the Flowshop Scheduling Problem with Delivery Dates and Cumulative Payoffs. This problem is a variation of the flowshop scheduling problem with job release dates that maximizes the total payoff with a stepwise job objective function. This paper contributes towards proposing a mathematical formulation for this new problem and an original constructive heuristic. Additionally, we develop a new benchmark of 300 hard instances which are available in a public repository. Besides, we provide primal and dual bounds for them. Extensive computational experiments were carried out taking into account classical constructive heuristics and hybrid local searches. Results show the merit of the FF heuristic when compared to other classical heuristics for flowshop scheduling problems. Additionally, we compare an Iterated Local Search (ILS), an Iterated Greedy Search (IGS), and a Biased Random-Key Genetic Algorithm (BRKGA), both customized for the studied problem, and a commercial mixed integer programming solver. The comparison between these methods showed that the BRKGA starting with a solution from FF heuristic is able to find the best solutions in a very short period of time. Iterated local Search and the commercial solver presented significantly worse results than the aforementioned methods. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:950 / 962
页数:13
相关论文
共 50 条
  • [1] HEURISTICS FOR FLOWSHOP SCHEDULING
    KING, JR
    SPACHIS, AS
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1980, 18 (03) : 345 - 357
  • [2] Flowshop scheduling problem with objective of minimizing TCT
    Durgadevi, R.
    Jayakumar, S.
    Vijayaragavan, R.
    JOURNAL OF INTERDISCIPLINARY MATHEMATICS, 2023, 26 (01) : 1 - 10
  • [3] Heuristics in Permutation GOMEA for Solving the Permutation Flowshop Scheduling Problem
    Aalvanger, G. H.
    Luong, N. H.
    Bosman, P. A. N.
    Thierens, D.
    PARALLEL PROBLEM SOLVING FROM NATURE - PPSN XV, PT I, 2018, 11101 : 146 - 157
  • [4] New heuristics for flowshop scheduling
    Chakraborty, UK
    APPLICATIONS AND SCIENCE IN SOFT COMPUTING, 2004, : 81 - 86
  • [5] Effective heuristics for the blocking flowshop scheduling problem with makespan minimization
    Pan, Quan-Ke
    Wang, Ling
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2012, 40 (02): : 218 - 229
  • [6] A flowshop scheduling problem with two operations per job
    Gupta, JND
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (08) : 2309 - 2325
  • [7] Local Search Heuristics for the Flowshop Sequence Dependent Group Scheduling Problem
    Matos Mendes, Nilson Felipe
    Claudio Arroyo, Jose Elias
    Madrid Villadiego, Harlem Mauricio
    PROCEEDINGS OF THE 2013 XXXIX LATIN AMERICAN COMPUTING CONFERENCE (CLEI), 2013,
  • [8] The paradoxes, accelerations and heuristics for a constrained distributed flowshop group scheduling problem
    Wang, Bing-Tao
    Pan, Quan-Ke
    Gao, Liang
    Li, Weimin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 196
  • [9] Effective heuristics for the distributed permutation flowshop scheduling problem with release dates
    Han, Biao
    Liu, Yu-Fan
    Pan, Quan-Ke
    Li, Yuan-Zhen
    2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 1744 - 1749
  • [10] Effective constructive heuristics and meta-heuristics for the distributed assembly permutation flowshop scheduling problem
    Pan, Quan-Ke
    Gao, Liang
    Li Xin-Yu
    Jose, Framinan M.
    APPLIED SOFT COMPUTING, 2019, 81