A review of cut-off grade policy models for open pit mining operations

被引:35
作者
Asad, Mohammad Waqar Ali [1 ]
Qureshi, Muhammad Asim [1 ]
Jang, Hyongdoo [1 ]
机构
[1] Curtin Univ, WASM, Dept Min Engn & Met Engn, Perth, WA, Australia
关键词
Optimization; Modelling; Cut-off grade; Processing; Open pit mining; OPTIMIZATION; STRATEGY; ALGORITHM; MINE; COMPLEXES; PRICE;
D O I
10.1016/j.resourpol.2016.05.005
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In an open pit mining operation, the heterogeneity of the grade-tonnage distribution of the deposit dictates that all available material within the boundaries of an open pit may not be processed. Given this heterogeneity, it is imperative that the valuable (ore) and waste materials are clearly identified. In this context, the cut-off grade defines the quantity of ore and waste, ensuring smooth supply of ore to the processing streams. While, the earliest significant effort towards the development of models for cut-off grade policy dates back to 1960s, a number of contributions on this vital aspect of a mining operation have been made since then. This paper presents a comprehensive overview of the available literature on cut-off grade policy models and suggests possible areas of future research. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:142 / 152
页数:11
相关论文
共 69 条
[1]  
Abdollahisharif J, 2012, J S AFR I MIN METALL, V112, P1065
[2]  
Asad M. W. A., 2005, International Journal of Surface Mining, Reclamation and Environment, V19, P176, DOI 10.1080/13895260500258661
[3]   Optimum cut-off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation [J].
Asad, M. W. A. .
ENGINEERING COMPUTATIONS, 2007, 24 (7-8) :723-736
[4]  
Asad MWA, 2011, J S AFR I MIN METALL, V111, P741
[5]   A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams [J].
Asad, Mohammad Waqar Ali ;
Dimitrakopoulos, Roussos .
RESOURCES POLICY, 2013, 38 (04) :591-597
[6]   Methods for calculation of optimal cutoff grades in complex ore deposits [J].
Ataei, M ;
Osanloo, M .
JOURNAL OF MINING SCIENCE, 2003, 39 (05) :499-507
[7]  
Ataei M, 2003, J S AFR I MIN METALL, V103, P493
[8]  
Ataei M., 2004, INT J SURF MIN RECLA, V18, P60, DOI [10.1076/ijsm.18.1.60.23543, DOI 10.1076/IJSM.18.1.60.23543]
[9]   SELECTION OF THE OPEN PIT MINING CUT-OFF GRADE STRATEGY UNDER PRICE UNCERTAINTY USING A RISK BASED MULTI-CRITERIA RANKING SYSTEM [J].
Azimi, Yousue ;
Osanloo, Montza ;
Esfahanipour, Akbar .
ARCHIVES OF MINING SCIENCES, 2012, 57 (03) :741-768
[10]   An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection [J].
Azimi, Yousuf ;
Osanloo, Morteza ;
Esfahanipour, Akbar .
RESOURCES POLICY, 2013, 38 (02) :212-223